Loading...
HomeMy WebLinkAbout323533_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101121848 PROJECT ADDRESS: 830 S Main St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/10/2024 INITIAL REVIEW 12/23/2024 EXPIRATION 6/8/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Marc Stibelman 3. TEL: (818)521-9750 FAX: VALUATION:$5,000.00 EMAIL: msteibleman@yahoo.com FLOOD ZONE:X-06059C0276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Sheet 001Openings are not permitted where the Fire Separation Distance is less than 3 feet. (CBC Table 705.8)First Plan Check Comment: Provide structural calculations.Second Plan Check Comment: Structural calculations on page 2 indicate a footing size of 4’-6” x 2’. However, the detail A/S1.1 shows a footing size of 30” x 1’. The calculations and plans must be consistent. Revise either the detail or structural calculations and resubmit for review.Structural calculations page 6 indicate a stamp from a different engineer. Remove the stamp from any engineer who is not the engineer of record."Structural calculations on page 9 indicate a TS 4x10 connection with a steel angle and bolts. However, detail 3/S1.1 shows a welded connection. Resolve the discrepancy and provide consistent details."Structural calculations on page 14 indicate #14 hex head screw and self-tapping cap screws. Specify these screw connections in the detail.Remove ‘Not for Construction’.Sheet A0.1.1Plan shows 8’-8” x 9’-4” trash enclosure. Dimension line shows 8’-6” x 9”-4” on the trash enclosure.Sheet S1.1 The dowel information is missing between the footing and CMU wall.Second Plan Check Comments:The two trash enclosure elevations appear similar, but only one is correct. Detail 1/S1 is the correct one; remove the incorrect detail."There are two trash enclosure plans on sheet S1.1. Only one plan is needed.Correct the detail callout to A/S1.1 in detail 2Provide a structural connection detail between the TS4x10 and the CMU wall.The End