Loading...
HomeMy WebLinkAbout325125_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101122344 PROJECT ADDRESS: 400 N Tustin Ave Unit# 301 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/30/2025 INITIAL REVIEW 2/9/2025 EXPIRATION 7/29/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bert Elliot 3. TEL: (714)840-5488 FAX: VALUATION: $123,000.00 EMAIL: elliottarc@socal.rr.com FLOOD ZONE: X-06059C0277J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. Complete the attached Disabled Accessibility Documentation Form.Provide on the drawings a complete window schedule showing: (For Sidelites) - Window sizes - Type and thickness of glazing Detail E3 / G501, referenced on sheet G-401 not found.Sheet G-401, seems like path of travel is behind the accessible parking.Provide dimension for accessible parking on south side of site plan. ( Please see red mark.)Sheet G-401, part of detail D1, does not match the locations and sheet numbers. ( please see red mark)Please revisit detail numbers and revise them to match the location and sheet number.On detail 1/ A602, identify size of the metal std.Sheet G401, Provide 12” clearance to the strike edge of women and men compartment toilet .Sheet G401, Is detail D1 new? Show the location on the site plan.Sheet G401, Grove is not required for curb ramp. Please remove it , if it is new.