Loading...
HomeMy WebLinkAbout323934_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101121987 PROJECT ADDRESS: 1535 E Edinger Ave PLAN CHECK ENGINEER: Le, TungTEL:714 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/19/2024 INITIAL REVIEW 1/21/2025 EXPIRATION 6/17/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Allysa Mae Dizon 3. TEL: (657)629-5991 FAX: VALUATION: $42,000.00 EMAIL: permit@ecosolarusa.com FLOOD ZONE: X-06059C0276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)Sheet PV-02: Attachment detail – The existing metal canopy roof was provided with corrugated metal roof over existing steel beam. Please revise detail to omit note specified ½” sheathing over rafters, if it’s not applicable to the existing roof condition. Sheet PV-02: Attachment detail – please clearly specify on the plan,the attachments are at 6-ft on center, per structural calculation. Structural calculation: Existing building Roof Area (Aroof): The PV system is proposed on the existing metal canopy roof. Please revise calculation using the area of the existing metal canopy only. Check for gravity loads and lateral loads based on the existing canopy roof area only. (End of Comment)