Loading...
HomeMy WebLinkAbout324458_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101122147 PROJECT ADDRESS: 2719 W Mar-Les Ln Unit# 3 PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/14/2025 INITIAL REVIEW 1/24/2025 EXPIRATION 7/13/2025 RECHECKS: 1.2/12/2025 PROJECT APPLICANT CONTACT PERSON: 2. Hung Le 3. TEL: (562)412-1818 FAX: (562)868-2128 VALUATION: EMAIL: le_hung4946@yahoo.com FLOOD ZONE: X-06059C0143J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationSubmitted documents shall be fully stapled/bound prior to approval.Truss drawings/calculations shall be stamped and signed by a licensed professional responsible for Truss design. These documents shall be reviewed and approved by the project EOR prior to plan check. If it is the same EOR stamping and signing for design as well as for review, it shall be noted next to the stamp. Submitted set is stamped and signed by the same engineer as the project, but no other stamp/signature provided so it is unclear if they the responsible party for the truss design. PC #2: Provided calculation package shall be reviewed and stamped by the EOR. Review stamp is acceptable, but shall be on the calculation package.CalculationsMembers labeled with “J”, “HR”, and “PB” are not found in calculation package. Ensure all Trusses are designed for and reviewed by EOR. Full review has not been completed and additional comments may occur. (End of Comment)