Loading...
HomeMy WebLinkAbout325822_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101122542 PROJECT ADDRESS: 1710 W Occidental St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/18/2025 INITIAL REVIEW 2/22/2025 EXPIRATION 8/17/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Aldo Mantellassi 3. TEL: (562)455-6734 FAX: VALUATION: $100,000.00 EMAIL: solarroadrunner@gmail.com FLOOD ZONE: X-06059C0257J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Applicant must pick up red marked sheet from the City prior to resubmittal and return the marked up set with resubmittal PLAN REVIEW COMMENTS: Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection. Show/provide safety glass in hazardous locations (R308) – Glazing in doors – all fixed and operable panels of swinging, sliding and bifold doors at front door entrance Veneer – On the plan, please specify manufacturer’s name, and ICC report number of the veneer. Provide detail attachment of veneer. Sheet A1.1 Clarify if there are any work done on the upper level? If not, please remove sheet from submitted set or provide notes on the drawing stating “For Information Only” Sheet A1.2 See comment on sheet A1.1 Sheet A1.3 See comment on sheet A1.1 Sheet S2.0 Detail 4: Provide location/elevation of 2x4 runners at 3 locations Sheet S2.1 Detail 4: Provide connector and spacing between the roof rafters blocking to double top plate. EOR to clarify, should the rafter tails and roof rafter be at the same spacing? If not, provide connection for rafter tail to roof rafter Red marked comment set is available to pick-up at the City Hall.(End of Comment)