Loading...
HomeMy WebLinkAbout326508_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101122756 PROJECT ADDRESS: 113 E Fourth St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/6/2025 INITIAL REVIEW 3/11/2025 EXPIRATION 9/2/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Fredy Villanueva 3. TEL: (714)948-6680 FAX: VALUATION: $12,000.00 EMAIL: Fredy@epicsignsandgraphics.com FLOOD ZONE: X-06059C0276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Plan shall be stamped, signed and dated by the sign engineer of record. Only one set of structural calculation was provided. Please provide two sets of structural calculation for approval. (End of Comment)