HomeMy WebLinkAbout326788_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 105122836 PROJECT ADDRESS: 1029 W Central Ave PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U, R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/13/2025 INITIAL REVIEW 3/17/2025 EXPIRATION 9/9/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bao Pham 3. TEL: (909)538-7067 FAX: VALUATION: $30,000.00 EMAIL: bao@bdpeng.com FLOOD ZONE: X-06059C0259J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☒Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Applicant must pick up red marked sheet from the City prior to resubmittal and return the marked up set with resubmittal PLAN REVIEW COMMENTS: Sheet CS-1 Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection. Revise building occupancy to R2 (this is a fourplex unit) Sheet A-1 Dwelling/garage separation – provide construction detail for minimum 5/8-inch Type X gypsum board is required at the underside of floor/ceiling where habitable space is above. Structure(s) supporting floor/ceiling assemblies used for separation shall be protected with 1/2-inch gypsum board. (CBC 406.3.2) Sheet S-2 2nd floor framing Design of BM-1 shall include overstrength factor for supporting discontinue lateral system (see comment 3bi for additional comment) Provide detail for how 2-2x10 is sister together High roof framing Provide structural calculation justification for lateral analysis design at the south-most exterior wall. Indicate the required shear wall length holdown size on plan. Sheet SD-1 Detail 7: T& G is not a part of approved plywood diaphragm per SDPWS or CBC CH 23. Red marked comment set is available to pick-up at the City Hall.(End of Comment)