HomeMy WebLinkAbout327061_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
104122955
PROJECT ADDRESS:
1151 W Seventeenth St
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/19/2025
INITIAL REVIEW
3/20/2025
EXPIRATION
9/15/2025
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Phuong Ton-Nu
3.
TEL:
(714)720-8901
FAX:
VALUATION: $10,000.00
EMAIL:
annie_tonnu@yahoo,com
FLOOD ZONE: X-06059C0144J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
GENERAL REQUIREMENTS
Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law.
This plan check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the extension request is approved, all plan checks will expire after 360 days from the submittal date. No further extension will be granted after 360 days from the submittal date.
This review does not include Mechanical, Electrical, and Plumbing (MEP).
Additional plan check fee will be required after the third review on hourly basis.
Obtain any applicable approval from the following agencies prior to permit issuance:
Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters.
Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters.
Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org.
Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status.
County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance.
School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance.
Cal/OSHA – Check the Cal/OSHA permit requirements here.
The stated valuation appears low. Please provide justification. The City may accept the contract price as the valuation if the applicant submits a signed contract showing labor and material costs for all work.
INSTRUCTIONS
Plans Pickup
The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit.
Plan Check Corrections
Address all items noted on this plan check report, either directly on this list or in a separate document.
Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response.
If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org.
Resubmittal
Resubmit the red-marked plans and calculations, if applicable.
Resubmit your responses to corrections.
Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set.
Resubmit all construction documents using one of the following options:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit.
Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins.
Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment.PLAN REVIEW COMMENTSSheet A-1
Provide a sheet index.
Provide a vicinity map.
The individual responsible for preparing the plans shall provide their signature.
There is no record of a fire sprinkler system in the city’s records. Confirm whether a fire sprinkler system is installed.
Provide a project directory, including the names and contact numbers of the property owner, tenant, and all design professionals (architectural, structural, mechanical, electrical, and plumbing).
List all other work requiring separate permits, if any.
List all deferral submittals, if any.
Remove all notes that do not apply to this project, including ramp and accessible parking notes. These items are not relevant to this project.
Provide a note indicating that this project shall comply with the 2022 California Building Code (CBC).
Under Scope of Work, replace “cancel back door of restroom” with “infill the doorway with a wall.”
Include the following note on the plan: 'All Notice of Violation items must be fully addressed. Partial compliance will not be accepted. All unpermitted work must be brought into full compliance.'
Sheet A-2
Specify sheet A4 as the reference for the proposed wall legalization.
Sheet A-3
Provide details on the materials and construction method for infilling the opening on the interior side of the wall.
Specify the type of hardware and the height on the new door.
Clarify the size and type of the window located next to the new door.
Specify a dimension between the new door and the window. Tempered glazing in the window is required if this distance is less than 2 feet.
End of Comments