HomeMy WebLinkAbout327748_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101123212 PROJECT ADDRESS: 511 N Grand Ave PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/10/2025 INITIAL REVIEW 4/11/2025 EXPIRATION 10/7/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jon Adams 3. TEL: (714)318-7074 FAX: VALUATION: $2,500,000.00 EMAIL: jon@aoarchitects.com FLOOD ZONE: X-06059C0276J GENERAL REQUIREMENTS Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law. This plan check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the extension request is approved, all plan checks will expire after 360 days from the submittal date. No further extension will be granted after 360 days from the submittal date. This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. Obtain any applicable approval from the following agencies prior to permit issuance: Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters. Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters. Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org. Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status. County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance. School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance. Cal/OSHA – Check the Cal/OSHA permit requirements here. INSTRUCTIONS Plans Pickup The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit. Plan Check Corrections Address all items noted on this plan check report, either directly on this list or in a separate document. Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response. If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org. Resubmittal Resubmit the red-marked plans and calculations, if applicable. Resubmit your responses to corrections. Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set. Resubmit all construction documents using one of the following options: Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit. Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins. Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment. PLAN REVIEW COMMENTS Sheet AN.00.1 Move the handwritten note, "All other work is covered under a separate plan," into the typed note. Revise General Note No. 1 to reference the 2022 Code Edition instead of the 2019 Edition. Remove items 1, 2, 4, and 5 under the Deferred Submittal section, as these items are not included in this permit. Sheet AN.00.2 This plan check does not include Mechanical, Electrical, and Plumbing (MEP) review. Update the Sheet Index, Section 17 'Electrical,' to either remove the electrical sheets or add the note: "Electrical work (For Reference Only)." The Sheet Index lists Civil Sheets (Storm Drain), Civil Sheets (Street), and sheets EV3.0, EV3.1, EV6.1, and EV7.1, but these sheets are missing. Provide the missing sheets or update the Sheet Index accordingly. Add Sheet A7.10 and Sheet S1-1.2 to the Sheet Index. Sheet A0.11 The civil plans indicate the location of the truncated dome near the trash enclosure, but there is no reference to the specific details. Although Sheet 2 provides a detail for the truncated dome (Detail 16), it references a truncated dome for SPPWC111-4, which is not included in the plans. Please provide the truncated dome detail that complies with the 2022 California Building Code Chapter 11B standards for accessibility. There appear to be two accessible routes from Fruit Street to the trash enclosure and the building. The width of the path is scaled at 5 feet, but this is not clearly indicated on the plans. Please provide a dimension showing the 5-foot width of the accessible route on the site plan. Ensure that the width of the sidewalk and walk is clearly called out, as the civil plans do not show this dimension. Provide a note on the plans indicating that the floor surface along accessible routes shall be stable, firm, and slip resistant. (11B-302.1) The building application shows 61 light standards. Please show the light pole locations and details on the site plan. The electric vehicle tabulations appear to be based on outdated codes. Please refer to the 2022 California Green Code Standards and the supplemental blue sheets effective July 1, 2024, for the most current requirements. Based on Table 5.106.5.3.1, there are over 200 actual parking spaces. Therefore, the number of required EV-capable spaces shall be 20% of the total parking spaces, and the number of EVCS spaces shall be 25% of the EV-capable spaces. Please revise the EV parking calculations to reflect these requirements. Identify the EV-capable spaces and Electric Vehicle Charging Stations (EVCS) on the site plan. Provide at least one Level 2 EVCS (Electric Vehicle Charging Station). Sheet A0.12 Sheet A0.12: The trash enclosure typically requires a rooftop to meet water runoff requirements from the public works agency. Please check with Planning and Public Works to verify if a rooftop cover is needed. If it is, include the details on the plan. Structural Sheets The engineer's stamp shows an expiration date of 2021, which has expired. Update the expiration date on the stamp and ensure the updated stamp is applied on the drawings. Provide structural calculations for the trash enclosure design. Provide structural calculations for the design of all screen walls. Sheet SI-4.3: The trash enclosure plan references Detail 5/SD1.0, but Sheet SD1.0 is missing. Provide the missing sheet or update the reference. End of Comments