HomeMy WebLinkAbout326714_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101122820
PROJECT ADDRESS:
4012 W Garry Ave
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
B, F-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/11/2025
INITIAL REVIEW
4/28/2025
EXPIRATION
9/7/2025
RECHECKS:
1.5/30/35
PROJECT APPLICANT CONTACT PERSON:
2.
Brad Kenson
3.
TEL:
(949)228-5687
FAX:
VALUATION: $35,000.00
EMAIL:
brad@fastrackpower.com
FLOOD ZONE: X-06059C0258J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)Sheet TS: On the plan, please specify the business type and use of the tenant space. 2nd Review: Please note on plan, “Tenant Space Is Not For Cannabis Business”. Sheet ST1.0 & ST1.1:It appears that the accessible route on the North side (right) of the building was not accurate. Please coordinate with the enlarged detail ST1.1. Revise plan to show concrete walkway outside of the building element (wall/columns). 2nd Review: Referenced enlarged plan on sheet ST1.1 – Please revise plan to show clear walkway from the building wall/columns. Sheet ID1.0:General Note #4: Please revise note to specify 2022 CBC / 2021 IBC. 2nd Review: Please revise note #4 to reference to 2022 CBC / 2021 IBC. (End of Comment)