Loading...
HomeMy WebLinkAbout326714_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101122820 PROJECT ADDRESS: 4012 W Garry Ave PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, F-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/11/2025 INITIAL REVIEW 4/28/2025 EXPIRATION 9/7/2025 RECHECKS: 1.5/30/35 PROJECT APPLICANT CONTACT PERSON: 2. Brad Kenson 3. TEL: (949)228-5687 FAX: VALUATION: $35,000.00 EMAIL: brad@fastrackpower.com FLOOD ZONE: X-06059C0258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)Sheet TS: On the plan, please specify the business type and use of the tenant space. 2nd Review: Please note on plan, “Tenant Space Is Not For Cannabis Business”. Sheet ST1.0 & ST1.1:It appears that the accessible route on the North side (right) of the building was not accurate. Please coordinate with the enlarged detail ST1.1. Revise plan to show concrete walkway outside of the building element (wall/columns). 2nd Review: Referenced enlarged plan on sheet ST1.1 – Please revise plan to show clear walkway from the building wall/columns. Sheet ID1.0:General Note #4: Please revise note to specify 2022 CBC / 2021 IBC. 2nd Review: Please revise note #4 to reference to 2022 CBC / 2021 IBC. (End of Comment)