Loading...
HomeMy WebLinkAbout322228_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101121401, 101121403, 101121399 PROJECT ADDRESS: 1220, 1222 N Jackson St Unit# A-B PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/30/2024 INITIAL REVIEW 11/27/2024 EXPIRATION 4/28/2025 RECHECKS: 1.4/23/2025 PROJECT APPLICANT CONTACT PERSON: 2.5/21/2025 Benito Corona 3. TEL: (714)371-7176 FAX: VALUATION: $60,000.00 EMAIL: bcndesigner@sbcglobal.net FLOOD ZONE: X-06059C0143J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationGrading permit is required for proposed structure. Applicant to apply prior to Building approval and get Grading permit prior to Building permit issuance. Ensure all hand written revisions are printed on resubmitted sets (e.g. Title block address)DrawingsSheet T-1 Provide the following design data on the first sheet (R106.1.1) ☐Sheet Index ☒Occupancy groups (R-3/U) ☐Type of construction (V-B) ☐Automatic Fire Sprinkler (YES or NO) ☐Number of stories. ☒Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☐Floor area per occupancy group, including the existing structure(s) ☐Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions. Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”. Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection. Add note and fill out value on the coversheet: Minimum ____ kWdc Photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request. For Solar Exemption, applicant must provide calculated kWh required and 2022 CEnC exemption on plans justifying exemption. THIS IS NOT A NOTEAdd ADU Addresses to Project AddressSheet A-1Revise detail references from A-4 to AD-1 where occurs.Provide FF elevation of new ADU structure to match Grading plans/permit.Sheet A-2 Show on the plans - attic vent locations, type and size (area = 1/150 of the attic space). Provide an attic cross ventilation summary; on the plans indicate the total area required versus provided. (R806.1) PC #2: Provide roof ventilation at low roof of ADU 2 or else justify unvented attic space.Fire rated wall between ADU’s shall span from floor to bottom of roof sheathing. Provide detail for exterior wall fire rated system and specify on plan where required.Roof projections spanning within 2’-0” to 5’-0” from property line shall have a 1-hour fire rated underside or code approved alternative. Specify on plan where required and provide detail for proposed system.PC #2: Verify ICC ESR-2022 specified in detail. This ICC report does not look to be for fire-rated ventilation. Ventilation shall not occur at fire rated projections unless an ICC approved product is specified.Verify kitchen range hood minim air flow with current 2022 CEnC. [Section 150.0(o)1G]Verify OPEN ABOVE area specified on Proposed 1st Floor Plan, area shall be identified to match 2nd Floor Plan.The following “Aging-in-place Requirements” shall be noted on plans (R327): Reinforcement for grab bar installation for bathrooms shall be provided. (R327.1.1) At least one bathroom on the entry level shall be provided with reinforcement installed. If there is no bathroom on the entry level, at least one on the second or third floor of the dwelling shall comply. Reinforcement shall be solid lumber or other construction materials approved by the enforcing agency. Reinforcement shall not be less than 2 by 8 inch nominal lumber or other construction material providing equal height and load capacity. Reinforcement shall be located between 32 inches and 39¼ inches above finished floor flush with the wall framing. Water closet reinforcement shall be installed on both side walls of the fixture, or one side wall and the back wall. Shower reinforcement shall be continuous where wall framing is provided. Bathtub and combination bathtub/shower reinforcement shall be continuous on each end of the bathtub and the back wall. Additionally, back wall reinforcement for a lower grab bar shall be provided with the bottom edge located no more than 6 inches above the bathtub rim. Electrical receptacle outlets, switches and controls intended to be used by occupants shall be located no more than 48 inches measured from the top of the outlet box and not less than 15 inches measured from the bottom of the outlet box above the finish floor unless exception met. (R327.1.2) Interior door width (at least one bedroom door and one bathroom door with 32” clear opening), effective July 1, 2024 (R327.1.3) Doorbell buttons or controls, when installed, shall not exceed 48 inches above exterior floor or landing, measured from the top of the doorbell button assembly. Where doorbell height requirement cannot be met for integrated doorbell features, a standard doorbell button or control shall also be provided at a height not exceeding 48 inches above exterior floor or landing, measured from the top of the doorbell button or control. (R327.1.4) The following Electric Ready notes shall be added and constructed for new detached residential structures: Water Heating system (water heater) – (Section 150.0(n)) Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n). If the designated space is within 3 feet from the water heater: A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater. ii. Isolate both ends of the unused conductor. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker A condensate drain that allows natural draining of the water heater. . If the designated space is more than 3 feet from the water heater: see additional Code requirements. When a second water heater is installed as part of the addition shall comply with Section (150.2(a)(D). Energy Storage System (ESS) Ready: All single-family residences that include one or two dwelling units, and ADU shall meet the following: At least one of the following shall be provided: ESS ready interconnection equipment [auto transfer switch and panel] with a minimum backed-up capacity of 60 amps and a minimum of four ESS-supplied branch circuits, or A dedicated, minimum 1” raceway from the main service to a subpanel that supplies the branch circuits in Section 150.0(s)(2). A minimum of four branch circuits shall be supplied by the ESS: the refrigerator, one lighting circuit shall be located near the primary egress, and at least one circuit shall supply a sleeping room receptacle outlet. The main panelboard shall have a minimum busbar rating of 225 amperes with space to install future isolation equipment/transfer switch within 3 feet. Heat pump space heater (furnace) ready: System using gas furnace to serve individual dwelling units shall include a dedicated 240 volt, minimum 30 amps branch circuit wiring shall be installed within 3-ft from the furnace for a future heat pump space heater installation. Electric cooktop ready: System using gas to serve individual dwelling units shall include a dedicated 240 volt, minimum 50 amps circuit wiring shall be installed within 3-ft from the cooktop for a future electric cooktop installation. Electric clothes dryer ready: Clothes dryer using gas to serve individual dwelling units shall include a dedicated 240 volt, minimum 30 amps branch circuit wiring shall be installed 3-ft from the clothes dryer location for a future electric clothes dryer installation.For new proposed water heater, see electric ready note for required designated area dimensions. Proposed area shall be identified on plans.Revise detail references from A-4 to AD-1 where occurs. Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2. (R302.4) Penetrations in wall or floor/ceiling assemblies in two-family dwellings shall comply with Section R302.4. Provide complete details on the plans. Sheet A-3Provide roof/ceiling insulation, per Title 24 calculation in building sections.Sheet AD-1 Under-stair protection: Provide ½-inch gypsum board on walls, under-stair surface and soffit on the enclosed side. (R302.7) Stairways (R311.7) – ☒Show minimum 36” clear width. ☒Provide/show 6’-8” clearly headroom above the stairway. ☒Show the dimension of rise and run of stairways on plans. Show 7.75" (203mm) maximum rise and 10" (229mm) minimum run with nosing of ¾” minimum and 1 ¼” maximum. ☒Provide minimum 36” landing at top and bottom of stairway. (R311.7.6) ☒Winder tread – 6" minimum run at narrower side; 10" minimum run at the walk line (the walk line is measured 12” from the narrower side). (R311.7.5.2.1) Handrails – ☒Handrails shall be provided at least on one side of each continuous run of treads or flight with four or more risers. (R311.7.8) ☒Handrails shall not project more than 4.5” on either side of the stairway. (R311.7.1) ☒Provide handrails not less than 34" or more than 38" above the nosing of tread. (R311.7.8.1) ☒ Provide 1¼" to 2" handgrip, 1½" from wall. (R311.7.8.3) ☒Handrail(s) shall be continuous the full length of the flight. Ends shall be returned or terminate in posts. (R311.7.8.2) Guardrails – (R312) ☒Guards shall be 42” in height. Where guardrails serve as handrails on the open sides of stairs – top of guardrails shall not be less than 34” and not more than 38” in height. ☒Guards shall not have openings which allow passage of 4” diameter sphere. At the space formed by the riser, tread and bottom rail of a guard – a 6” sphere cannot pass through. Sheet S-1Specify if foundation rebar is single layer or top and bottom. Justify % steel reinforcing requirement is met in foundation, calculations designed for 18” thick foundation. Top reinforcing should be provided for any foundation supporting lateral loading or uplift.PC #2: Comment not addressed.Detail 1 – Guardrail post references plans, please verify where on plans this is located.Calculations design for 2-2x12 floor joists. Revise drawings to match.Calculations design for 2x10 ridge boards. Revise drawings to match. Sheet T24 – 1 Revise project name to specify which ADU T24 compliance form is for.T24 compliance shall use latest 9.3 version of Energypro.Sheet T24-2Revise project name to specify which ADU T24 compliance form is for.T24 compliance shall use latest 9.3 version of Energypro.CalculationsPage 19 – Elements supporting discontinuous shear walls shall be designed with any lateral loading applied to member with overstrength factor. Justify calculation for beams, posts, or foundation supporting shear walls above provided. Typical all members where applies. Page 21 – Coordinate floor joist with plans. Page 33 – Shearwall type designed do not match drawings. Revise drawings to match calculations as needed. PC #2: Comment not addressed. Shear wall types on plans at roof level do not match calculations. See additional comment for further calculation concern.Additional PC #2 CommentsVerify shearwall design in provided calculations. 1st floor shearwall design does not look to be supporting 2nd story shear where occurs (e.g. Gridline B). Please justify.PC #3: Comment is not addressed, calculations do not look to provide load transfer from 2nd floor to 1st. EOR may call to discuss.(End of Comment)