Loading...
HomeMy WebLinkAbout327205_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101123006 PROJECT ADDRESS: 2317 W Harvard St Unit# 2 PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/24/2025 INITIAL REVIEW 4/23/2025 EXPIRATION 9/20/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Peter Mac 3. TEL: (714)312-8184 FAX: VALUATION: $150,000.00 EMAIL: pmconstruction247@gmail.com FLOOD ZONE: X-06059C0257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. PLAN CHECK COMMENTS Sheet A2. The 36” wide door between bedroom #2 and bathroom #2 may not fit. Please review and revise design. Sheet A2. Revise and revise hallway width to accommodate the 36” wide door leading to bedroom #1. Provide hallway width dimensions on plan. Sheet A2. Revise attic access location. Minimum unobstructed headroom in the attic space shall be 30 inches measured vertically from the bottom of ceiling framing members. Sheet A3. Show and clarify attic space insulation in cross-section A. Minimum R-19 required between rafters and R-30 in the at ceiling. Sheet A3. Show 30” minimum headroom required above attic access. Show correct ADU address on the first page of CF-1R form and the title block on all T-24 sheets:” 2317 W Harvard Street Unit #2” STRUCTURAL Show correct ADU address on the cover page of structural calculation and the title block on all structural sheets:” 2317 W Harvard Street Unit #2” Submit (2) copies of structural calculation. Add note on the foundation plan:” Scarify top 12” or recompact 4’ overexcavation prior to trenching for the utility and/or foundation. 90% compaction report is required at the time of foundation inspection. Damp proofing, base course and pre-saturation are required. (Santa Ana soils report exceptions). Provide minimum 5” slab on grade reinforced with #4 at 18” on centers each way over 4” base of ½” or larger clean aggregate with 10 mil vapor retarder in direct contact with concrete. Slab shall be tied-in to continuous 12” wide x 24” (minimum embedment into firm soil) foundation. (Santa Ana soils report exceptions). Sheet S1.0. Detail 10/S0.1 at the top connection of non-bearing wall is not available. END OF COMMENTS