Loading...
HomeMy WebLinkAbout328833_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101123578 PROJECT ADDRESS: 20 Civic Center Plz PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/2/2025 INITIAL REVIEW 5/15/2025 EXPIRATION 10/29/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jonathan Aguirre 3. TEL: (714)819-5724 FAX: VALUATION: $500,000.00 EMAIL: jaguirre@santa-ana.org FLOOD ZONE: X-06059C0276J GENERAL REQUIREMENTS Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law. This plan check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the extension request is approved, all plan checks will expire after 360 days from the submittal date. No further extension will be granted after 360 days from the submittal date. This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. Obtain any applicable approval from the following agencies prior to permit issuance: Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters. Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters. INSTRUCTIONS Plans Pickup The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit. Plan Check Corrections Address all items noted on this plan check report, either directly on this list or in a separate document. Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response. If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org. Resubmittal Resubmit the red-marked plans and calculations, if applicable. Resubmit your responses to corrections. Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set. Resubmit all construction documents using one of the following options: Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit. Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins. Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment.PLAN REVIEW COMMENTSSheet G1.0 Provide the engineer’s stamp and signature on the plan. (CBC 107.3.4)Sheet G3.0 The font size for the general notes is too small. Increase the font size to ensure readability.Sheet A1.0Keynotes appear in front of each door, but the text is too small to read. Please revise the plan to ensure all keynotes are legible and clearly referenced.Provide descriptions for all symbols shown in the Legend to ensure clarity and proper interpretation of the plans.Sheet A2.0Provide a keynote indicating demolition of the interior walls located between the entry door and the sink in both the men’s and women’s restrooms. Confirm that these walls are non-bearing.The 5-foot turning diameter (wheelchair turn-around clearance) is shown in the women’s restroom. Please provide the same turning clearance in the men’s restroom to demonstrate accessibility compliance. Provide the following note on detail 9: Unisex toilet and bathing facilities shall be identified by a circle ¼” thick, 12” in diameter, with a ¼” thick triangle with a vertex pointing upward superimposed on the circle and within the 12” diameter. The triangle symbol shall contrast with the circle symbol, either light on a dark background or dark on a light background. The circle symbol shall contrast with the door, either light on a dark background or dark on a light background (11B-216.8.1,11B-703.7.2.6.3) Provide the following detailing on detail 9:Accessible restroom geometric symbol shall be mounted at 58-60 inches above the finished floor measured from the centerline of the symbol. (11B-703.7.2.6)End of Comments