PLAN CHECK NO:
101122789-91
PROJECT ADDRESS:
517 N Sunset / 517 N Sunset unit 2 / 517 N Sunset unit 3
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/10/2025
INITIAL REVIEW
3/25/2025
EXPIRATION
9/6/2025
RECHECKS:
1.05/20/2025
PROJECT APPLICANT CONTACT PERSON:
2.
David Nguyen
3.
TEL:
(510)650-5499
FAX:
VALUATION: $205,000.00
EMAIL:
httr.3g@gmail.com
FLOOD ZONE: X-06059C0257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
ARCHITECUTRAL PLAN CHECK COMMENTS
New attached ADU. Note that structural design does not match architectural section 2/A2.0. Refer to structural comment #4 below regarding ceiling and ridge structural design.
STRUCTURAL COMMENTS
Sheet S-2. Ceiling-tie is not available for the 2x8 ridge board. Revise ridge design to design as ridge beam.
PC2: New attached ADU. Refer to architectural section 2/A2.0, ceiling joists and rafters are not connected together to form truss action supporting roof ridge. Detail 14/SD1.0 on grid line 1 also not matching the architectural design. Please review ridge design.
END OF COMMENTS