Loading...
HomeMy WebLinkAbout330060_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 104123965 PROJECT ADDRESS: 1531 W Fifth St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/10/2025 INITIAL REVIEW 7/16/2025 EXPIRATION 12/7/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Timothy Coyle 3. TEL: (714)379-8317 FAX: VALUATION: $25,000.00 EMAIL: xgraphicstim@gmail.com FLOOD ZONE: X-06059C0257J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039)Plan was incomplete. Provide the following information are required for plan review and approval.Plan shall be legible. Provide the cover sheet with the following information: (107 CBC)Occupancy groupsType of construction (V-B) Automatic Fire Sprinkler (YES) or (NO)Number of stories.Floor area per occupancy groupConstruction shall comply with the CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code.Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulation. Provide Sheet Index. On the plan, provide scope of work. Provide floor plan with door schedule (interior & exterior doors) and operable hardware. The building must be accessible to the person with disability. Reference should be made to the California Building Code and Federal Accessibility Laws for complete requirements. It is the project designer’s/property owner’s responsibility to show compliance with all applicable Federal and State Accessibility laws and regulations. Show all site related items on drawings prior to approval of site plan and show full compliance on drawings when submitted into Building Safety Division for reviewing. Accessibility requirements shall comply with the applicable provision in Chapter 11B, CBC. Show accessible route from the public sidewalk to the building accessible entrance. Show accessible entrance and provide detail.Show accessible parking stall(s) and locate on an accessible route to the building entrance. Show accessible restroom facilities. Provide all required accessible details on the plan. Provide egress plan showing means of egress comply with Chapter 10, CBC. Plan was incomplete. Additional comments will be required at time of resubmittal. (End of Comment)