HomeMy WebLinkAbout328881_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101123590 PROJECT ADDRESS: 1407 N King St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/5/2025 INITIAL REVIEW 6/3/2025 EXPIRATION 11/1/2025 RECHECKS: 1.6/25/2025 PROJECT APPLICANT CONTACT PERSON: 2. Abraham Brito 3. TEL: (714)483-6968 FAX: VALUATION: $150,000.00 EMAIL: abrahambrito@yahoo.com FLOOD ZONE: X-06059C0144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A-1 Provide the following design data on the first sheet (R106.1.1) ☐Sheet Index ☐Occupancy groups (R-3/U) ☐Type of construction (V-B) ☐Automatic Fire Sprinkler (YES or NO) ☐Number of stories. ☒Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☐Floor area per occupancy group, including the existing structure(s) ☐Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions. Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”.PC #2: Verify (E)SFD square footage used. Number does not match area tabulation table. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection. Add note on the coversheet: Minimum ____ kWdc Photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request. For Solar Exemption, applicant must provide calculated kWh required and 2022 CEnC exemption on plans justifying exemption. THIS IS NOT A NOTEAdd GC sheets to Sheet Index Exterior walls without Automatic Residential Fire Sprinkler – (Table R302.1(1)) Roof projection – Provide one-hour protection on the underside of roof projection when projected into the 5-ft of fire separation distance. No projection beyond 2-ft of the fire separation distance. No attic ventilation may occur at rated projections unless ICC approved fire rated ventilation specified.Sheet A-3Provide attic access where required on each floor or justify not requiring. Sheet A-4Specify where eave vents occur. No eave vent permitted along fire rated roof projection unless ICC approved product specified.Specify Roof Plan Key Note #6 on Roof Plan.Sheet A-6New building, or addition more than 1000 sq.ft. – Provide Whole house ventilation. On the plan, please provide/show method of whole house ventilation in compliance with ASHRAE Standard 62.2. – provide complete notes, details and calculations. (150.0(o))Verify keynote on Second Floor with “#” Energy Storage System (ESS) Ready: All single-family residences that include one or two dwelling units, and ADU shall meet the following: At least one of the following shall be provided: ESS ready interconnection equipment [auto transfer switch and panel] with a minimum backed-up capacity of 60 amps and a minimum of four ESS-supplied branch circuits, or A dedicated, minimum 1” raceway from the main service to a subpanel that supplies the branch circuits in Section 150.0(s)(2). A minimum of four branch circuits shall be supplied by the ESS: the refrigerator, one lighting circuit shall be located near the primary egress, and at least one circuit shall supply a sleeping room receptacle outlet. The main panelboard shall have a minimum busbar rating of 225 amperes with space to install future isolation equipment/transfer switch within 3 feet. Sheet S-1All sheets pertaining to soil/foundation shall be reviewed and stamped/signed by geotechnical engineer of record. Sheet S-2Provide interior non-bearing wall details for each floor.Specify Ceiling Joist in low roof area left of stairway.Provide detail reference/support for hip beams over stairs at roof level.Specify roof framing direction/size between hip and nailer at roof level.CalculationsPage 12.0 – Loading from SW above for seismic shall include overstrength. Ensure beam design adequate with wind load used vs. Seismic loading with overstrength. Typ all framing supporting discontinuous shearwals.PC #2: New member framing should not be designed to be overstressed. Beam member 4F should be resized as needed to allow for a DCR of less than 1.0.(End of Comment)