HomeMy WebLinkAbout330704_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101124139
PROJECT ADDRESS:
808 E Fourth St
PLAN CHECK ENGINEER:
Le, TungTEL:714
647-5896
EMAIL:
Tle10@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/26/2025
Revision to roof framing
INITIAL REVIEW
7/7/2025
EXPIRATION
12/23/2025
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Danny Rodriguez
3.
TEL:
(714)926-4389
FAX:
VALUATION:
EMAIL:
drodjr50@gmail.com
FLOOD ZONE: X-06059C0276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.
Plans shall be legible.
NOTES: Please revise note to specify 2022 CBC, 2022 CRC.
There are two (2) details 17 provided on the plan (sheet S-3.0). Please relabel/renumber the details.
Provide detail to show new 4x14 to post. Detail shall be clearly cross-referenced onto the plan.
Provide structural calculation for the 4x14 ceiling beam supporting the roof frames. Structural calculation and plans shall be stamped, signed and dated by a California registered civil/structural engineer.
New pad footing is required to support the new ceiling beam. Provide calculation and revise foundation plan accordingly.
Foundation schedule, CF-2: For clarity, please revise foundation schedule to specify 24” x 24” continuous footing (not PAD as indicated on the plan).
Provide detail to show new purlin to existing roof framing; new braces to purlin and to new ceiling – clearly show fastener schedule. Details shall be clearly cross-reference onto the plan.
Provide detail to show ceiling joists at the new ceiling beam – show ceiling splice lap connection. Details shall be clearly cross-reference onto the plan.
(End of Comment)