HomeMy WebLinkAbout328645_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101123560
PROJECT ADDRESS:
1009 W River Ln Unit# 2
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/30/2025
INITIAL REVIEW
5/4/2025
EXPIRATION
10/27/2025
RECHECKS:
1.6/25/2025
PROJECT APPLICANT CONTACT PERSON:
2.
Jane Lewis
3.
TEL:
(714)558-3981
FAX:
VALUATION: $300,000.00
EMAIL:
jane@steichenlewis.com
FLOOD ZONE: AE-06059C0144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☒Police Department approval on the corrected/final set of drawings (647-5840).
☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☒Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationGeotechnical engineer to provide minimum foundation criteria for two-story condition. Only 1-story wall footing condition is specified.Geotechnical engineer shall review, stamp, and sign all drawing sheets pertaining to foundation/soil. DrawingsSheet T1.0
Provide the following design data on the first sheet (R106.1.1)
☐Sheet Index
☐Occupancy groups (R-3/U)
☐Type of construction (V-B)
☐Automatic Fire Sprinkler (YES or NO)
☐Number of stories.
☐Flood Zone: X
☐Flood Zone: A
☒Flood Zone: AE
☐Floor area per occupancy group, including the existing structure(s)
☒Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.Ensure all hand written items are provided in resubmittal (e.g. demo scope of work item)
Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet. Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.
Fix Structural list of drawings on List of Drawings. Various sheets do not match or are not provided in set.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”.
Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection.
Add note on the coversheet: Minimum ____ kWdc Photovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request.
For Solar Exemption, applicant must provide calculated kWh required and 2022 CEnC exemption on plans justifying exemption. THIS IS NOT A NOTESheet GN1Green Building Standards Code shall be completed with latest July 2024 Supplement version.Verify selection for Section 4.106.4.1, new attached private garage shall be provided with 208/240v branch circuit. PC #2: New Green Building Standards Code checklist has not been filled out. Please fill out entire checklist.Sheet C-001Note on Grading Plan sheet “FOR REFERENCE ONLY, GRADING UNDER SEPARATE PERMIT”Sheet A2.0Provide stair width on plan.Verify Keynote 4b and 4c specified at door between garage and ADU. Specify elevation change between ADU and Garage.Keynote 8b – Update required air flow at kitchen range hood per latest 2022 California Energy Code requirements.Keynote 10b – Detail 2/Sheet A4.0 not found. Add the following “Aging-in-place Requirements” notes on plan and provide detail for Note (a) grab bar backing (R327):
Reinforcement for grab bar installation for bathrooms shall be provided. (R327.1.1)
At least one bathroom on the entry level shall be provided with reinforcement installed. If there is no bathroom on the entry level, at least one on the second or third floor of the dwelling shall comply.
Reinforcement shall be solid lumber or other construction materials approved by the enforcing agency.
Reinforcement shall not be less than 2 by 8 inch nominal lumber or other construction material providing equal height and load capacity.
Reinforcement shall be located between 32 inches and 39¼ inches above finished floor flush with the wall framing.
Water closet reinforcement shall be installed on both side walls of the fixture, or one side wall and the back wall.
Shower reinforcement shall be continuous where wall framing is provided.
Bathtub and combination bathtub/shower reinforcement shall be continuous on each end of the bathtub and the back wall. Additionally, back wall reinforcement for a lower grab bar shall be provided with the bottom edge located no more than 6 inches above the bathtub rim.
Electrical receptacle outlets, switches and controls intended to be used by occupants shall be located no more than 48 inches measured from the top of the outlet box and not less than 15 inches measured from the bottom of the outlet box above the finish floor unless exception met. (R327.1.2)
Interior door width (at least one bedroom door and one bathroom door with 32” clear opening), effective July 1, 2024 (R327.1.3)
Doorbell buttons or controls, when installed, shall not exceed 48 inches above exterior floor or landing, measured from the top of the doorbell button assembly. Where doorbell height requirement cannot be met for integrated doorbell features, a standard doorbell button or control shall also be provided at a height not exceeding 48 inches above exterior floor or landing, measured from the top of the doorbell button or control. (R327.1.4)Sheet A2.1Verify keynote 10e referenced at roof edge. Does not look to be correct.Verify keynote 10f referenced at solar panels. Note 10f not provided.Detail 2 – 5/8” fire-rated gyp board shall span up to underside of roof sheathing.Sheet A2.2Mechanical Notes – Update required air flow at kitchen range hood per latest 2022 California Energy Code requirements.Electrical Notes – Add PV note #14 to cover sheet.
The following Electric Ready notes shall be added and constructed for new detached residential structures:
Water Heating system (water heater) – (Section 150.0(n))
Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n).
If the designated space is within 3 feet from the water heater:
A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater.
ii. Isolate both ends of the unused conductor.
A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker
A condensate drain that allows natural draining of the water heater.
. If the designated space is more than 3 feet from the water heater: see additional Code requirements.
When a second water heater is installed as part of the addition shall comply with Section (150.2(a)(D).
Energy Storage System (ESS) Ready: All single-family residences that include one or two dwelling units, and ADU shall meet the following:
At least one of the following shall be provided:
ESS ready interconnection equipment [auto transfer switch and panel] with a minimum backed-up capacity of 60 amps and a minimum of four ESS-supplied branch circuits, or
A dedicated, minimum 1” raceway from the main service to a subpanel that supplies the branch circuits in Section 150.0(s)(2).
A minimum of four branch circuits shall be supplied by the ESS: the refrigerator, one lighting circuit shall be located near the primary egress, and at least one circuit shall supply a sleeping room receptacle outlet.
The main panelboard shall have a minimum busbar rating of 225 amperes with space to install future isolation equipment/transfer switch within 3 feet.
Heat pump space heater (furnace) ready: System using gas furnace to serve individual dwelling units shall include a dedicated 240 volt, minimum 30 amps branch circuit wiring shall be installed within 3-ft from the furnace for a future heat pump space heater installation.
Electric cooktop ready: System using gas to serve individual dwelling units shall include a dedicated 240 volt, minimum 50 amps circuit wiring shall be installed within 3-ft from the cooktop for a future electric cooktop installation.
Electric clothes dryer ready: Clothes dryer using gas to serve individual dwelling units shall include a dedicated 240 volt, minimum 30 amps branch circuit wiring shall be installed 3-ft from the clothes dryer location for a future electric clothes dryer installation.Sheet A3.0East Side Elevation - Where fire rated wall required, provide detail and proposed fire rated veneer at veneer portion.Rear (North) & East Side Elevation – Detail 2/2.0 referenced not found.
Veneer –
On the plan, please specify manufacturer’s name, and ICC report number of the veneer.
Provide detail attachment of veneer. Sheet S1Provide calculations for non-Hardy Frame pad footings.PC #2: Provide top bars for pads supporting holdowns or any uplift loading, else justify bottom bars only. See additional calculation comment.Sheet SD-3Detail 1 & 2 – Arch to provide ventilation calculation and proposed ventilation for enclose roof areas between roof rafters and ceiling joists. Else justify no ventilation provided.CalculationsSheet 43 of 43 – Verify detail 11/SD3 referenced at guardrail. Detail does not match calculation design. Additional PC #2 CommentsCalculationsJustify minimum concrete reinforcing 0.0014 used in calculation for pad footings with current code allowances.(End of Comment)