HomeMy WebLinkAbout331285_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101124298
PROJECT ADDRESS:
1609 E Twenty-First St
PLAN CHECK ENGINEER:
Lee, WayneTEL:714
647-5848
EMAIL:
wlee@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/9/2025
INITIAL REVIEW
7/24/2025
EXPIRATION
1/5/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Samuel Yu
3.
TEL:
(310)508-7147
FAX:
VALUATION: $65,000.00
EMAIL:
cmassociatesmcs@gmail.com
FLOOD ZONE: X-06059C0163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Sheet A.1. Transpose all handwriting notes into the drawings. E.g. Scope of work.
Sheet A.1. Provide description of the interior remodel scope of work, including location and square footage.
Sheet A.3. Provide requested dimensions, measured from end to end of the building corner in new addition. See redlines on plan.
Sheet A.3. Identify infilled openings on plan. See redlines on plan.
Sheet A.4 and A5.1 and A6. Refer to redlines on the drawings.
Sheet S.1. Update governing codes to 2022 version of California Building Code.
Sheet S.4. Clarify interior load bearing wall design and provide connection details at the top of the wall to support and rafters on plan. See redlines on plan.
Sheet S.4. Detail 4 and detail 7. Minimum 8-16d nailing are required at the rafter and ceiling connections and ceiling laps per CBC Table 2308.7.3.1. Please update those details.
Sheet S.4. Provide shear transfer detail at braced line #A.
Sheet S.5. See redlines on plan.
END OF COMMENTS