Loading...
HomeMy WebLinkAbout331500_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101124361 PROJECT ADDRESS: 2414 N Tustin Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/16/2025 INITIAL REVIEW 8/5/2025 EXPIRATION 1/12/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Pete Gabrich 3. TEL: (949)622-8759 FAX: (949)250-1529 VALUATION: $75,000.00 EMAIL: Peterg@whainc.com FLOOD ZONE: X-06059C0164J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)Final drawings and calculations shall be stamped and signed by the Registered Design Professional and shall include the date of signing below the stamp. (California Business & Professions Code 5537, 5538, 6737.1, and 6745).Sheet A0.00. Clarify the occupancy group within leasing office. Specify occupancy group per 2022 CBC Ch3. Plan shows occupancy group R-4 appears incorrect.Sheet A0.00. Indicate on the cover sheet that if the leasing office is equipped with fire-sprinkler system.Sheet A0.00. Show number of stories of the leasing office. Plan shows 2 and 3 story building is confusing and may not be correct.Sheet A0.00. Indicate total square footage of the tenant improvement area.Sheet A2.20. Detail 4/A3.00 shown in the wall legend is not available.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing field problem of 2½” wide metal studs not being able to accommodate plumbing pipes. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.16 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Provide on the drawings details for the lateral support of partitions, rails and similar space dividers less than 5’ 9” in height. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above. - Reference each fire-resistive assembly to a CBC Chapter 7 Table and Item number. - Fire-blocks and draft-stops in combustible construction in accordance with CBC Section 718. Show location(s) and provide typical construction details. - Fire/smoke damper locations, installation requirements and required access doors. Refer to CBC Section 716 and mechanical Code Section 606.A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in Chapter 11B, 2022 CBC. Revise the drawings to show compliance. Provide details to show how existing non-compliant items will be upgraded to current standards.Show detailed information, including dimensions, on existing accessible parking, ramps, and toilet facilities, to verify conformance with the current requirements. (CBC 11B-502, 11B-405, 11B-603 through 11B-606.7)Handles, pulls, latches, locks, and other operable parts on doors and gates shall comply with 11B-309.4 Operation. Operable parts of such hardware shall be 34 inches minimum and 44 inches maximum above the finish floor or ground. Where sliding doors are in the fully open position, operating hardware shall be exposed and usable from both sides. §11B-404.2.7The force for pushing or pulling open a door or gate other than fire doors shall be as follows: §11B-404.2.9Interior hinged doors and gates: 5 pounds maximum.Sliding or folding doors: 5 pounds maximum.Required fire doors: the minimum opening force allowable by the appropriate administrative authority, not to exceed 15 pounds.Exterior hinged doors: 5 pounds maximum.Swinging door and gate surfaces within 10 inches of the finish floor or ground measured vertically shall have a smooth surface on the push side extending the full width of the door or gate. Parts creating horizontal or vertical joints in these surfaces shall be within 1/16 inch of the same plane as the other and be free of sharp or abrasive edges. Cavities created by added kick plates shall be capped. §11B-404.2.10STRUCTURALSheet A2.10. Identify any load-bearing walls to be removed on plan. It is architect/engineer’s responsibility to indicate it on plan before plan check approval. Provide structural plans and calculations by a licensed architect or civil, structural engineer if any structural walls (e.g. load-bearing or shear walls) are removed.Sheet A2.20. Provide structural framing and foundation plans to design the new hard lid ceiling.Sheet A2.20. Clarify the type of mechanical equipment to be relocated and show location on plan. Identify the weight of equipment. Provide structural design and details to support the equipment. Structural calculation is required if the equipment weights more than 400 pounds.END OF COMMENTS