HomeMy WebLinkAbout330078_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101123972
PROJECT ADDRESS:
1001 S Grand Ave
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/10/2025
INITIAL REVIEW
6/21/2025
EXPIRATION
12/7/2025
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Naresh Arya
3.
TEL:
(949)400-5961
FAX:
VALUATION: $30,000.00
EMAIL:
nkarya@gmail.com
FLOOD ZONE: X-06059C0276J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application.Identify total length of the fencing on the scope of work.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following:
- Disabled access compliance must be shown on the site plan.CBC Section 1022.2.2, Exterior exit doors shall lead directly to the exit discharge or the public way.Provide on the drawings a complete door schedule, showing:
- Door sizes (CBC Sections 11B-404)
- Hardware complying with exiting and disabled accessibility requirements Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”CBC Section 10101.2.1. Exit doors shall swing in the direction of exit travel when serving any hazardous area or when serving an occupant load of 50 or more.Panic hardware shall comply with CBC Section 1010.1.10. Panic hardware shall be provided as required by CBC Section(s):
- An Occupancy with an occupant count > 50.All doors require a level floor landing on each side in accordance with CBC Sections 1010.1.5. Provide typical door threshold details and details of change in floor covering material.Existing accessible route cannot be fenced or blocked, please see redmark.