Loading...
HomeMy WebLinkAbout332126_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101124543 PROJECT ADDRESS: 4300 Westminster Ave Bldg# A PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK in-lieu of one-hour OCCUPANCY CLASSIFICATION(S): A-2, A-3, B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/4/2025 INITIAL REVIEW 8/10/2025 EXPIRATION 1/31/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Alfredo Adame 3. TEL: (714)235-1181 FAX: VALUATION: $10,000.00 EMAIL: alfredoad1338@gmail.com FLOOD ZONE: A-06059C0143J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.Please return marked up set of drawings with corrections. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet S00.0 Provide the following design data on the first sheet ☒Sheet Index ☒Occupancy groups ☒Type of construction ☒Automatic Fire Sprinkler (YES or NO) ☒Number of stories. ☒Flood Zone: A Provide a project description with a complete and detailed scope of work on the cover sheet of the plans. Note on Cover Page: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection.Specify building addresses on each building on Site Plan.Identify area of scope of work on site plan.CalculationsProvide justification for existing framing with new equipment weight. There is no identification of existing weight or difference in weight between existing and new.(End of Comment)