Loading...
HomeMy WebLinkAbout325919_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101122566 PROJECT ADDRESS: 2026 N Olive St PLAN CHECK ENGINEER: Huang, GaryTEL:714 647-5862 EMAIL: Ghuang@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/17/2025 INITIAL REVIEW 4/30/2025 EXPIRATION 9/13/2025 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Daniel Scheinberg 3. TEL: (954)856-6445 FAX: VALUATION: $60,000.00 EMAIL: danielscheinberg@gmail.com FLOOD ZONE: X-06059C0163J GUIDELINES: Comments contained within this report reflect only those of the Building and Safety Division. Additional comments or corrective action may be required by other Departments and/or outside Agencies This Plan Review Report and all subsequent code references are based upon the most recent version(s) of the 2022 California Building Codes (CBC, CRC, CFC, CEC, CPC, CMC, CGBSC, and CEES) The approval of plans and any supporting documents does not permit the violation of any section of the adopted building codes or other pertinent local ordinances, or state and federal laws All listed plan review comments must be adequately addressed before a building permit can be issued Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used. Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☒Public Works Agency approval (647-5039). ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039). Applicant must pick up red marked sheet from the City prior to resubmittal and return the marked up set with resubmittal PLAN REVIEW COMMENTS: Applicant shall address all the checked‘☒’ correction comments below before resubmitting plans to Building Safety for recheck. Sheet A-1 Coordinate sheet index with submitted drawings. Provide missing sheets for review, e.g. sheets E-1 to E-4, sheets GB-1 to GB-2 and sheet S-3. Update sheet index as required. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection. Sheet A-5 Show/provide safety glass in hazardous locations (R308) – Glazing in doors – all fixed and operable panels of swinging, sliding and bifold doors. Means of egress / Doors – (R311) On the plan, provide a landing or floor on each side of each exterior door. Landing shall have width of not less than the door served and a minimum of 36” measured in the direction of travel. Clarify if there are any work to be done at the garage. The common wall between the garage and the bedrooms seems to be reduced in wall thickness. Sheet A-11 Reference details 4, 5, 6, 7, 8 on plan where occur. If details are not applicable, delete from the drawing set. Detail 10 not clear for review. Please provide legible detail for review. Sheet S2 Provide (N) ceiling framing size and direction at the two (2) bathrooms where new ceiling is been done. Provide construction detail for how (N) ceiling is connect to the (E) wall framing Provide (N) ceiling framing size and direction at the (N) office. Provide construction detail for how (N) ceiling is connect to the existing wall/new wall. (End of Comment)