HomeMy WebLinkAbout332605_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101124689
PROJECT ADDRESS:
2536 W California St
PLAN CHECK ENGINEER:
Meshkat, SeyedyahyaTEL:714
647-5831
EMAIL:
smeshkat@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/19/2025
INITIAL REVIEW
9/4/2025
EXPIRATION
2/15/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Felix Padilla
3.
TEL:
(949)396-9236
FAX:
VALUATION: $75,000.00
EMAIL:
tccfelixpadilla1@gmail.com
FLOOD ZONE: X-06059C0257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2022 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. Structural sheets are missing. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840).
- Public Works Agency approval (647-5039).
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.In addition to other fees, a "Park Acquisition and Development Fee" in the amount shownbelow
shall be required pursuant to a resolution of the City Council for the Recreation andCommunity
Services Agency; net addition of 2 bedroom(s).Amount of $9,326.00; net addition of 5 bedroomsAmount of $8,383.00; net addition of 4 bedroomsAmount of $7,571.00; net addition of 3 bedroomsAmount of $5,642.00; net addition of 2 bedroomsAmount of $4,235.00; net addition of 1 bedroom
Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.
Complete the Grading exemption checklist and reproduced onto the plan. If answering “NO” to any of the questions, a grading plan and a grading permit shall be required.
Through penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1.1 or R302.4.1.2. (R302.4)
Every dwelling unit shall be provided with heating facilities capable of maintaining a room temperature of not less than 68°F (20°C) at a point 3 feet (914 mm) above the floor and 2 feet from exterior walls in habitable rooms at the design temperature. The installation of one or more portable space heaters shall not be used to achieve compliance with this section. (R303.10)
Please see marked-up plans for additional requirement/comments.
Energy Conservation – Title 24 Energy forms & calculations
Water Heating system (water heater) – (Section 150.0(n)) Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n).
A. If the designated space is within 3 feet from the water heater:
i. A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater.
ii. Isolate both ends of the unused conductor.
iii. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker
iv. A condensate drain that allows natural draining of the water heater.B. If the designated space is more than 3 feet from the water heater: see additional Code requirements.
CalGreen Plan Review Comments:
Bathroom Exhaust Fan (Section 4.506.1)
Fans shall be ENERGY STAR compliant and be ducted to terminate outside the building
Unless functioning as a component of a whole house ventilation system, fan must be controlled by a humidity control.
Structural Plan Review Comments:
Missing structural plans (3 sets). Additional comments may arise after reviewing the structural plans.
Notches in sawn lumber joists, rafters, beams shall not be more than ¼ of the member depth at ends. (R502.8.1)
Ceiling joists shall be minimum 2X8 per Title 24 calculations to accommodate insulation of R30.
Revise edge distance of epoxy holdown calculations from infinity to 1 ¾” for 2x4 walls. Total width should match existing footing width.Additional Review Comment:
Red marked comment set is available to pick-up at the City Hall.