HomeMy WebLinkAbout330149_2_Corrections.docxPLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101123990
PROJECT ADDRESS:
2401 N Bristol St
PLAN CHECK ENGINEER:
Huang, GaryTEL:714
647-5862
EMAIL:
Ghuang@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/25/2025
INITIAL REVIEW
8/19/2025
EXPIRATION
1/21/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Fallon Franklin
3.
TEL:
(714)647-3378
FAX:
VALUATION: $477,000.00
EMAIL:
ffranklin@santa-ana.org
FLOOD ZONE: AE-06059C0144J
GUIDELINES/INSTRUCTIONS:
Applicant must pick up red marked sheets from the City prior to resubmittal and return the marked up set with resubmittal. The drawings markups (Redlines) are available to pick up at the Building Division counters by walk-ins. Appointments are not required. Our business hour is Monday through Thursday and alternative Fridays from 8:00 am to 3:00 pm. See the Holiday and Closed Friday Schedule before you plan your visit.
Plan Check Comments Instructions - Review all corrections and provide a written response.All items noted on this plan-check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker. Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used
Resubmit [two] corrected sets of plans.
Resubmittal Instructions – Provide a written response to the Plan Check Comments. Provide two copies of the latest construction document (drawings, calculations, and others related document). Provide one additional copy of drawings for new constructions or additions. Resubmit all construction document with one of the three options below:
Resubmittal Bin: Complete the Plan Check Re-Submittal Form along with the resubmittal. The resubmittal bin is available at the City Hall Ross Annex lobby, Monday through Thursday and alternating Fridays from 8:00 am – 4:00pm. See the Holiday and Closed Friday Schedule before you plan your visit.
Walk-ins: Daily walk-ins are available for resubmittals at first come first serve basis. Please note all scheduled appointments will be served first prior to any walk-ins.
Appointment: Call the Building division at 714-647-5800 to schedule a resubmittal appointment, or contact your assigned permit counter staff for your specific project.
GENERAL REQUIREMENTS
Applicant shall obtain clearance/approvals from following departments after obtaining approval from Building and Safety Division, prior to building permit issuance
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☐Police Department approval on the corrected/final set of drawings (647-5840).
☒Public Works Agency approval (647-5039).
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).
Plan Check Expiration – This plan check will expire after 180 days from the submittal date unless the applicant request for an extension. The extension request must be in writing and demonstrate a justifiable cause. The Building Official is authorize to grant a one-time extension of additional 180 days. If the extension request is approved, all plan checks will expire after 360 days from the submittal date. No further extension will be granted after 360 days from the submittal date.
MEP Reviews – This review does not include Mechanical, Electrical, and Plumbing (MEP).
Additional plan check fee will be required after the third review on hourly basis.
PLAN REVIEW COMMENTS:
Sheet C0101
Provide on plan the scope of work. Per current submitted application is only parameter block wall around the Garthe reservoir facility; however, the submitted package included mat foundation for IX vessels, pretreatment units and etc. Please coordinate with City Public Work representative the actual scope of work. Remove all other sheets/details that are not a part of scope of work or update the scope of work
Provide sheet index for the submitted package drawings
The drawings shall be stamped and signed by California Licensed Civil Engineer
List any deferred submittal
Provide/indicate property address on plan
Remove note “NOT For Construction” from the plan, typical to all sheets
Note to contractor, note 5: verify reference and provide sheet CD0101 for review
Sheet C0102
Update construction notes that are applicable under the scope
Sheet C0103
See comment on sheet C0102
Sheet C0203
Coordinate scope of work with public work City Engineer. Current application is only for the block wall. Remove sheet and notes that are not applicable, typical to all sheets. Otherwise, please update scope of work
Sheet C0504
Detail 5: provide drawing sheet S0502 for review
Sheet S0001
Seismic design parameters: EOR to verify Sds with soil report
Pipe rack and pipe supports: Ip =1.5 for risk category III
Sheet S0501
Detail 3: please verify if the detail reference for the lap splice shall be 12/S0501 and not detail 4/-
Sheet S0504
Detail 2:
please coordinate foundation note, should it be (E) slab.
EOR to provide equipment anchorage design and indicate on the plan. The anchorage design shall not be design by the contractor
Sheet S1101
Per submitted application, the scope of work is only for the block wall. Remove all items are not a port of scope; otherwise, update the scope of work
Sheet S1301
EOR to coordinate with detail 1/S1503 for the wall footing. Detail 1/S1503 and calculation required 7’-0” deep footing
Sheet S1503
Detail 1:
Provide detail for fabricated screen connection, plate size, bolt size and embedment
Sheet S3102:
See comment on sheet S1101
Red marked comment set is available to pick-up at the City Hall.(End of Comment)