Loading...
HomeMy WebLinkAbout333032_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101124825 PROJECT ADDRESS: 2119 S Broadway PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: SPK OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/28/2025 Revision INITIAL REVIEW 9/2/2025 EXPIRATION 2/24/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Alex Gholi 3. TEL: (714)423-9745 FAX: VALUATION: EMAIL: coastmetro@sbcglobal.net FLOOD ZONE: X-06059C0276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. Sheet 3 and 4: Dimensions showed on plans were off scale. Please revise plan to scale. Sheet 3: Door 3 between garage and residence – Please specify door to be rated for 20 minute, self-closing and self-latching. Sheet 4: Some the texts are mirrored, including the window dimensions. Please coordinate and revise plan to be legible. Sheet S-2: Provide/show exterior footing for the extended exterior stairway wall. Sheet S-3: Please show framing information for the roof cover over the exterior stairway. (End of Comment)