PLAN CHECK NO:
102124882
PROJECT ADDRESS:
219 E First St
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/4/2025
INITIAL REVIEW
10/1/2025
EXPIRATION
3/3/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Elex Lopez
3.
TEL:
(949)456-9228
FAX:
VALUATION: $58,000.00
EMAIL:
elopez@designworks-pdc.com
FLOOD ZONE: X-06059C0276J
GENERAL REQUIREMENTS
Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law.
This plan check will expire 180 days from the original submittal date unless a written request for extension is submitted and approved. The request must demonstrate justifiable cause. The Building Official may grant a one-time extension of up to 180 additional days. No further extensions will be granted beyond 360 days from the original submittal date.
Effective January 1, 2026, the City of Santa Ana will enforce the 2025 California Building Standards Codes for all new plan submittals. Plans submitted prior to this date shall be governed by the 2022 codes; however, any plan check that expires after January 1, 2026, will be required to comply with the 2025 codes.
When submitting corrections, clearly indicate where each change has been made. Reference the applicable sheet number, detail number, or relevant note for every correction to facilitate accurate and efficient review.
This review does not include Mechanical, Electrical, and Plumbing (MEP).
Additional plan check fee will be required after the third review on hourly basis.
Obtain any applicable approval from the following agencies prior to permit issuance:
Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters.
Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters.
Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org.
Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status.
County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance.
School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance.
Cal/OSHA – Check the Cal/OSHA permit requirements here.
Submit plans directly to the Orange County Fire Authority (OCFA) for review and approval. Provide a Service Request (SR) number as proof of submittal. Immediate action is required to avoid permitting delays.
PERMIT APPLICATION
This project involves two addresses: 219 E. First Street and 116 N. Spurgeon Street. Submit a separate permit application for 116 N. Spurgeon Street and revise the scope of work for 219 E. First Street. The scope of work for each address must be clearly stated.This project includes two addresses. Obtain Planning Division clearance for 116 N. Spurgeon Street before resubmittal to the Building Division.
INSTRUCTIONS
Plans Pickup
The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit.
Plan Check Corrections
Address all items noted on this plan check report, either directly on this list or in a separate document.
Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response.
If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org.
Resubmittal
Resubmit the red-marked plans and calculations, if applicable.
Resubmit your responses to corrections.
Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set.
Resubmit all construction documents using one of the following options:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit.
Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins.
Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment.PLAN REVIEW COMMENTSSheet A-1
Provide a clear 9" x 9" blank space near the bottom-right corner of the title sheet to accommodate City approval stamping.
Provide a sheet index.
This project includes two addresses. Clearly list both on the title sheet and in the title block of each sheet as “219 E. First Street, Santa Ana, California 92701” and “116 N. Spurgeon Street, Santa Ana, California 92701.”
This plan set includes work for two separate addresses. Clearly specify each address, its scope of work, and the corresponding plan check number.Project Scope:Specify the number of windows being replaced.Include the installation of two car lifts.Remove the canopy.Repair cracked or uneven surfaces.Under the Project Data section, separate and clearly identify the project data for each address (e.g., occupancy group, construction type, floor area, etc.)Reviewing the Site Area tabulation, Area B (446 sq. ft.) and Area D (239 sq. ft.) are unpermitted. Combine these areas, as they are considered an addition to the existing building. Show this total square footage under Project Data, clearly separating the existing square footage from the addition.
The individual responsible for preparing the plans shall provide their signature.
Provide the engineer’s stamp and signature on all structural sheets.
Delete the code reference to 2022 CRC under General Note. This is not a residential project.
List all deferred submittals on the plans. If there are none, clearly indicate “No deferred submittals.”
Include the following note on the plan: 'All Notice of Violation items must be fully addressed. Partial compliance will not be accepted. All unpermitted work must be brought into full compliance.'
The occupancy group is not VB & S1. Provide the correct occupancy group and type of construction as two separate data entries.
Sheet A-1 shows Business occupancy group “B” and Storage occupancy “S-1”; however, the floor plan indicates a sales area. Revise the occupancy group to Mercantile “M”and maintain Storage occupancy “S-1”.
Verify whether the proposed scope of work includes a change of occupancy. If a change of occupancy is proposed, clearly identify on the plans the occupancy classification(s), showing the existing occupancy and the proposed occupancy. If no change of occupancy is proposed, add a note on the plans stating: "No change of occupancy is proposed."
The property lines are not drawn correctly. This project involves two parcels. Research recorded map for details and revise the property lines as required.Identify the location of the canopy to be removed on the site plan.Identify the location of the cracked or uneven surfaces to be repaired on the site plan.
Show all easements on the site plan. If there are none, add a note stating “No known easements.”
On the site plan, indicate all exit discharge paths from the building’s exterior exit doors extending continuously to the public way.
The plans lack essential accessibility information, including parking, accessible routes, and signage. These details are required to demonstrate compliance with 2022 CBC Chapter 11B, Division 5, and must be provided before a complete plan check can be conducted.
The site plan shows an accessible parking space; however, dimensions are not provided, and the space is not identified as van-accessible as required by Section 11B-208.2.4. Revise to designate the stall as van-accessible and provide full width and length dimensions for both the stall and access aisle.
Revise the access aisle for the van-accessible parking space so that it is located on the passenger side.
Based on Google Street View, the proposed accessible parking space and access aisle differ from existing conditions. Clarify whether the location is being changed or rotated. If so, include this in the scope of work. Provide an existing site plan showing current conditions and a proposed site plan showing the revised layout.
Graphically show an exterior accessible route (e.g. dashed line) from the accessible parking spaces to the building entrance.
Show an accessible route from the public sidewalk to the building entrance.Sheet A-2
Provide an International Symbol of Accessibility (ISA) on the parking floor surface per 11B-502.6.4.
Show full compliance for the parking space identification signs by per CBC Section 11B-502.6 (identification, finish and size, location, and marking).
Provide a van-accessible sign in accordance with CBC 11B-502.6. Refer to the code section for proper placement, wording, and mounting requirements.
Provide an unauthorized vehicle sign per CBC 11B-502.8.2.
The plan appears to show striping beyond the access aisle, but it is unclear whether this is intended to represent actual striping or simply to graphically depict the accessible route. If striping is proposed, clearly label and detail it on the plan.Show the property line between the two parcels on the site plan. The required fire-resistance rating of the exterior wall, including limitations on the size and percentage of openings, is determined by the fire separation distance measured from the exterior wall to the property line. Clearly indicate the fire separation distance on the drawings to establish compliance with CBC Table 602 and CBC Section 705.Provide structural calculations and connection details between the vehicle lift and the foundation. Sheet A-4Provide a complete structural design for the additions at the repair area and storage area. Include all related structural details and supporting structural calculations, stamped and signed by a licensed Civil or Structural Engineer.Provide a soils report for review.End of Comments