Loading...
HomeMy WebLinkAbout333243_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101124891 PROJECT ADDRESS: 201 E Fourth St PLAN CHECK ENGINEER: Le, TungTEL:714 647-5896 EMAIL: Tle10@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/5/2025 INITIAL REVIEW 10/15/2025 EXPIRATION 3/4/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jeff Beddow 3. TEL: (949)722-7400 FAX: (949)722-8855 VALUATION: $20,000.00 EMAIL: jeff.saproperties@gmail.com FLOOD ZONE: X-06059C0276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)Sheet 0.1: On the plan, please specify Occupancy Groups for the building (A-2, B, M). Please provide a floor plan. Structural wall supporting existing fire-rated floor assembly above is protected with one-hour fire-rated assembly. Hence, new W header and HSS members supporting the new opening and wall shall be protected with one-hour assembly. Provide detail for rated assembly and clearly cross-reference detail onto the plan. Sheet 0.3: Structural specification Based on the permit record, the Risk category for the building is III and important facto I = 1.25. Please revise Structural Specification accordingly. On the plan, please specify the existing structural lateral resisting system and R coefficient. It appears that the subject CMU wall was an existing special reinforced masonry shear wall. New proposed opening in existing shear wall may prohibit. Structural calculation: Page 8 of 24: Revise Wind analysis for Risk Category III and I = 1.25. Revise calculation and plan accordingly. Page 9 of 24: Revise Seismic loads analysis for Risk Category III and I = 1.25. Revise calculation and plan accordingly. Page 12 of 24: The 30-ft CMU shear wall is located adjacent to the stairwell; therefore, there is no support at the top of wall (at 13.5-ft). Please coordinate and revise structural calculation and plan accordingly. Page 13 of 24: Please clarify how the 317 kips seismic load was derived. Page 21 of 24: Please check CMU Wall and footing for the concentrated loads from the lintel post. (End of Comment)