Loading...
HomeMy WebLinkAbout333607_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101125019 PROJECT ADDRESS: 3300 W Segerstrom Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/18/2025 INITIAL REVIEW 10/31/2025 EXPIRATION 3/17/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Carrie Shafifi 3. TEL: (626)384-0481 FAX: VALUATION:$8,000.00 EMAIL: carriesharif@yahoo.com FLOOD ZONE:X-06059C0258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.Resubmit 2corrected sets of plans.All drawings shall be signed by the person who prepared these plans and specifications.Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714) 573-6100). - Public Works Agency approval (647-5039).Sheet T1.0. Add note on plan on the cover sheet: Type of construction: III-BSheet T1.0. Delete IBC 2022 from the applicable codes on plan.On the title block, provide sheet number and provide description on the second sheet to match sheet index. The index shows Sheet A1.0 and labeled as overall floor plan.Provide proposed floor plan with following information for plan review:Plan shall be labeled as proposed floor plan on plan.Plan shall be to scale and show scale on plan.Show dimensions and height on each rack on plan.Show clear distance between racks and not less than 44 inches minimum on plan.Identify use of the room where the racks are installed. Show any permanently installed furniture, equipment, partitions within the room.Show distance from racks to the walls and to any obstructions (e.g. equipment, furniture, partitions…). Maintain 44 inches minimum clearance.Show interior dimensions of the room on plan.Show and identify all exit doors within the room/space on plan.CBC Section 1705.12.7, Storage racks and access floors. Periodic special inspection is required during the anchorage of access floors and storage racks 8’ or greater in height in structures assigned to Seismic Design Category D, E or F.Note on the drawings locations and inscriptions of 50 square inch minimum size permanent plaques installed in conspicuous locations, indicating the maximum permissible unit load in clear, legible print on plan.Lower portions of posts exposed to damage by forklift trucks or other moving equipment shall have protective devices. If not so protected, at the option of the building official, the rack structure may: (1) be designed to maintain its full design load capacity at allowable stresses with the exposed post capacity reduced by one-half or (2) be designed to maintain its full design load capacity at 50 percent increased allowable stresses with the exposed post assumed to have no carrying capacity.Provide anchor bolt design and concrete anchorage design calculation to justify detail 5/SED.END OF COMMENTS