Loading...
HomeMy WebLinkAbout333608_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101125020 PROJECT ADDRESS: 3501 W Segerstrom Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/18/2025 INITIAL REVIEW 10/31/2025 EXPIRATION 3/17/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Carrie Sharifi 3. TEL: (626)384-0481 FAX: VALUATION:$110,000.00 EMAIL: carriesharif@yahoo.com FLOOD ZONE:X-06059C0258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.Resubmit 2corrected sets of plans.Please refer to red marks on the drawings for additional plan check comments. Revise drawings to show compliance.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714) 573-6100). - Public Works Agency approval (647-5039).Revise plans to clarify warehouse occupancy. The proposed floor plan shows warehouse occupancy is S-1. However, the cover sheet and part of the proposed floor plan showing occupancy is S-2. Please clarify and make consistent across the drawings. (note that existing building record shows S-1 occupancy)Show all occupancy group within the building on the cover sheet.Revise notes on the cover sheet to show storage height is 20 feet instead of 18 feet per your design.CBC Section 1705.12.7, Storage racks and access floors. Periodic special inspection is required during the anchorage of access floors and storage racks 8’ or greater in height in structures assigned to Seismic Design Category D, E or F.Note on the drawings locations and inscriptions of 50 square inch minimum size permanent plaques installed in conspicuous locations, indicating the maximum permissible unit load in clear, legible print on plan.Lower portions of posts exposed to damage by forklift trucks or other moving equipment shall have protective devices. If not so protected, at the option of the building official, the rack structure may: (1) be designed to maintain its full design load capacity at allowable stresses with the exposed post capacity reduced by one-half or (2) be designed to maintain its full design load capacity at 50 percent increased allowable stresses with the exposed post assumed to have no carrying capacity.END OF COMMENTS