HomeMy WebLinkAbout334082_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101125177 PROJECT ADDRESS: 1422 S Parton St PLAN CHECK ENGINEER: Meshkat, SeyedyahyaTEL:714 647-5831 EMAIL: smeshkat@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/6/2025 INITIAL REVIEW 10/17/2025 EXPIRATION 4/4/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Oscar Rico 3. TEL: (714)653-3755 FAX: VALUATION: $35,000.00 EMAIL: ricobuilders@yahoo.com FLOOD ZONE: X-06059C0276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council. GENERAL COMMENTS:All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Red marked comment set is available to pick-up at the City Hall. ARCHITECTURAL COMMENTS: For the purpose of Park & Rec Development fee calculation, please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.  Note on plan: The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”. Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection. Revise the APN number on cover sheet to 013-132-18. Sheet titles and numbers should match with the sheet index: change sheet title of A4 to “existing elevations”, Sheet number A9 to A8, GBC to GBC-1 and GBC-2. Provide a Site Drainage plan, prepared by a California registered civil engineer, with the following information, but not limited to: Drainage slopes and flow patterns Drainage system such as swales, french drains, water collection and disposal system, etc. Drainage plan shall indicate how the site grading or drainage system will manage all surface water flows to be diverted away from buildings and adjoining property lines, in accordance with all applicable codes The grade shall fall not fewer than 6 inches within the first 10 feet from the foundation wall. Where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains, or swales shall be constructed to ensure drainage away from the structure. Impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building. (R401.3 CRC) Exterior walls without Automatic Residential Fire Sprinkler – (Table R302.1(1)) Exterior walls located less than 5-ft from a property line shall be of one-hour construction. Provide a detail and cross reference the detail on plan. Eaves projection –No projection beyond 2-ft of the fire separation distance. Revise the roof plan to show the eliminated projection. Through penetrations and/or membrane penetrations of fire-resistance-rated wall or floor assemblies shall comply with Section R302.4.1 and/or R302.4.2. respectively (R302.4). Provide details, manufacturer name of product and verification of code required tests compliance. Specify ceiling heights on the plans, minimum 7-ft ceiling height for habitable space, and for hallways. Laundry room, bathroom, toilet room, and un-habitable basements shall have ceiling height not less than 6-ft 8-iches. (R305.1) Show/provide safety glass for glazing in enclosure of shower. Doors width on plan do not match with the door schedule for doors 2,3, and 4. Means of egress / Doors – Show landing with dimensions and drop amount at threshold. (R311) On the plan, provide a landing or floor on each side of each exterior door. Landing shall have width of not less than the door served and a minimum of 36” measured in the direction of travel. Landing shall not be 1 ½” lower than the top of the threshold when doors swing over the landing or floor; otherwise, landing can be 7 ¾” maximum lower than the top of the threshold. Please provide minimum 36” clear access throughout the building (hallway). (R311.6) Smoke Alarms – Provide smoke alarm(s) in each sleeping room; in each area giving access into each sleeping room. (R314) Carbon Monoxide Alarms – Provide carbon monoxide alarms at outside of each sleeping area, in the immediate vicinity of the bedroom. (R315) Exterior wall covering – Call out exterior wall finish material on elevations. Detail corrosion–resistant weep screed minimum of 4” above the earth or 2” above paved areas. (R703.7.2.1) Provide detail to show exterior wall covering with water-resistive barrier in accordance with Section R703.2. Emergency escape and rescue openings – (R310) Provide emergency escape from basements, habitable attics and every sleeping room. (R310.1) The escape opening shall have a minimum net clear opening of 5.7 sq. ft. with 24" minimum net clear height and 20" minimum net clear width. Escape window shall have a finished sill height not more than 44" above the floor. At grade-floor is allowed to have escape opening of 5.0 sq. ft. (R310.1) Attic access and Ventilations – Calculations call for (3) dormer vents but roof plan shows only (2).Calculations show (2) gable end vent but it is not shown in elevations. Clarify if roofing is new or existing, omit new roof notes on sheet A3 if it is existing. Shower compartments, regardless of shape, shall have a minimum finished interior of 1024 square inches and shall also be capable of encompassing a 30 inch circle, show dimensions on plan. Energy Conservation – Title 24 Energy forms & calculations Kitchen shall be vented to the outside. On the plan, please show exhaust fan(s), and specify the range type (electric vs. gas) in kitchen. Kitchen Range Hood Airflow Rate (CFM) shall comply with Table 150.0-G Show required insulation for both exterior walls on section B. Show Water Heating system (water heater) on floor plan – (Section 150.0(n)) Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n). If the designated space is within 3 feet from the water heater: A dedicated 125-volt, 20-amp electrical receptacle that is connected to the electric panel with a 120/240-volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater. Isolate both ends of the unused conductor. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker A condensate drain that allows natural draining of the water heater. If the designated space is more than 3 feet from the water heater: see additional Code requirements. CalGreen Plan Review Comments: Plumbing fixtures flow rate limitation (Section 4.303) Water closet – 1.28 gallon per flush Shower head – 1.8 gallons per minute at 80 psi. Lavatory faucets – 1.2 gallon per minute at 60 psi. Kitchen faucet – 1.8 gallon per minute at 60 psi. Bathroom Exhaust Fan (Section 4.506.1) Fans shall be ENERGY STAR compliant and be ducted to terminate outside the building Unless functioning as a component of a whole house ventilation system, fan must be controlled by a humidity control. Structural Review Comments: Existing garage converted into ADU (habitable space): Provide calculations for proposed ceilingjoists. Show existing roof framing for clarification. Provide construction details for the infilled wall at the existing garage door opening.Show attachment at top and bottom of wall. Provide concrete curb (stem wall) at existing door opening. Provide moisture barrier for the existing concrete slab. If surface product is used, provide ICC or UL listing Provide calculations for pull out capacity of epoxy holdowns. Include overstrength factor in design, ACI 318-19, 17.10.5.3 (d). Show on plan the minimum required existing footing depth (to verify in field) to achieve the proposed embedment depth for epoxy holdowns. Exclude the existing garage curb from the required footing depth. Remove redundant details which are not used in this project (e.g. 4/SD1).