HomeMy WebLinkAbout334606_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101125331
PROJECT ADDRESS:
1851 E Deere Ave
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
A-2, B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/21/2025
INITIAL REVIEW
10/26/2025
EXPIRATION
4/19/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Randy Fair
3.
TEL:
(562)897-0426
FAX:
(562)602-2081
VALUATION: $96,000.00
EMAIL:
randy@csaconstructors.com
FLOOD ZONE: X-06059C0278J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A001
Provide a Site Drainage plan with the following information, but not limited to:
Location of all existing and proposed structures, property lines, right-of-way lines, and easements, including dimensions and setbacks Sheet S101Verify new AC unit weight with mechanical drawings. Weight does not match. (1200# on M Sheets)Sheet S200Detail 3 – Provide flashing information/detail around new platform.CalculationsProvide new unit spec/cutsheet for weight justification.Verify curb/platform weights are considered in existing framing calculations. (End of Comment)