Loading...
HomeMy WebLinkAbout334164_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101125196 PROJECT ADDRESS: 3601 S Harbor Blvd PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): B, E PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/20/2025 INITIAL REVIEW 10/21/2025 EXPIRATION 4/18/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Tim Lally 3. TEL: (714)633-7667 FAX: VALUATION: $2,000,000.00 EMAIL: tim.lally@mjpaia.com FLOOD ZONE: X-06059C0258J GENERAL REQUIREMENTS Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law. This plan check will expire 180 days from the original submittal date unless a written request for extension is submitted and approved prior to expiration. The request must include justifiable cause. The Building Official may approve a one-time extension of up to an additional 180 days. No extensions will be granted beyond 360 days from the original submittal date. Effective January 1, 2026, the City of Santa Ana will enforce the 2025 California Building Standards Codes for all new plan submittals. Plans submitted prior to this date shall be governed by the 2022 codes; however, any plan check that expires after January 1, 2026, will be required to comply with the 2025 codes. When submitting corrections, clearly indicate where each change has been made. Reference the applicable sheet number, detail number, or relevant note for every correction to facilitate accurate and efficient review. This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. Obtain any applicable approval from the following agencies prior to permit issuance: Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters. Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters. Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org. Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status. County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance. School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance. Cal/OSHA – Check the Cal/OSHA permit requirements here. INSTRUCTIONS Plans Pickup The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit. Plan Check Corrections Address all items noted on this plan check report, either directly on this list or in a separate document. Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response. If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org. Resubmittal Resubmit the red-marked plans and calculations, if applicable. Resubmit your responses to corrections. Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set. Resubmit all construction documents using one of the following options: Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit. Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins. Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment.Sheet T Provide a 9" x 9" blank space near the bottom-right corner of the title sheet, outside the title block, for the City approval stamps. This building plan check does not cover Mechanical, Electrical, and Plumbing (MEP) review. Physically remove the MEP sheets from this plan and update the sheet index to reflect theirremoval. Add the following note under Scope of Work: “Occupancy change from Group B to Group B and Group E on the second floor. Provide the following note on the plans indicating the plan check numbers (PC#) and the corresponding scope of work: PC# 101125196: TI & Change of OccupancyPC# 101125053: Interior DemolitionPC# 101125151: Site Improvement Delete the code references to the Historical Building Code under Building Codes. This project isnot classified as a historical building. List all deferred submittals on the plans. If there are none, clearly indicate “No deferred submittals.” Under Project Area, provide the following area breakdown: • Tenant Improvement: 13,413 sq. ft. • New Stair: X sq. ft • Total Area: X sq. ft. The project lists the construction type as II-B, whereas City records indicate Type V-N. For the purpose of Type of Construction reclassification, the architect shall provide a stamped and signed letter confirming that all building elements are noncombustible per CBC Table 601. Please submit this letter along with the next plan submittal.Sheet G4.2 Provide an allowable area analysis in accordance with CBC Section 506 for the change of occupancy from Group B to Group E and Group B on the second floor. Show that the actual area of the building does not exceed the allowable area of the building per Table 506.2. Therefore, the design is code compliant. Group E cannot be considered an accessory occupancy per Section 508.2, since the floor area exceeds 10% of the main occupancy. For the allowable area, choose one of the following approaches and show it clearly on the plans:Option A:Treat the second floor as Group E. The allowable area is 43,500 sq ft, which exceeds the 13,413 sq ft on the second floor, so this option complies. Option B: Use mixed occupancies (Group B and Group E). If this approach is used, provide the required occupancy separation walls and show the corresponding calculations. Option C:Reduce the classroom area so it is less than 10% of Group B floor area, allowing it to be treated as accessory occupancy.Show that the actual number of stories does not exceed the allowable number of stories per Table 504.4. Therefore, the design is code compliant.Show that the actual building height does not exceed the allowable building height per CBC Table 504.3. Therefore, the design is code compliant.The existing building is equipped with a fire sprinkler system. On the plan, clearly indicate whether the proposed work affects the sprinkler system: No modifications: Add a note that the existing fire sprinkler system will remain unchanged.Modifications required: Indicate that updated fire sprinkler plans must be submitted to OCFA for review and approval.Site Plan On the site plan, indicate all exit discharge paths from the building’s exterior exit doors extending continuously to the public way.Add note: “The site accessibility design is reviewed under Building Permit #101125151.” Show the imaginary property lines per CBC Section 705.3. Indicate the fire separation distance (FSD) from the exterior walls of each building to the imaginary property line. Once these FSDs are indicated, compliance with exterior wall fire rating and opening protection requirements per Sections 705.5 and 705.8 can be evaluated.Sheet G3.2 Provide plumbing fixture calculations for the project, showing both the number of fixtures required by code and the number provided. Demonstrate that the provided fixtures meet or exceed therequirements of the California Plumbing Code. Show full compliance for the interior accessible route by addressing the following per the CBC: a. Floor surfaces (11B-302.1) b. Slopes (11B-403.3) c. Walkway width (11B-403.5.1) d. Vertical clearance (11B-307.4) e. Protruding objects (11B-307.2) f. Changes in level (11B-303) Verify that the existing elevator complies with current accessibility requirements. Since the building was previously classified as a Business occupancy, the existing elevator may not meet current accessibility standards. With the proposed change of occupancy, provide documentation confirming that the elevator is accessible. If it is not compliant, specify the required upgrades to meet accessibility standards.Sheet G4.2(Life and Safety Plan) Provide a complete exit analysis for the entire tenant improvement. The analysis shall demonstrate compliance with CBC Chapter 10 and include occupant load calculations, number and width of required exits, travel distances, and continuous exit paths from exit access through exit discharge. Supporting documentation must be clearly shown on the plans, including occupant load tables, path of travel diagrams, egress width calculations, door swing directions, and exit signage. Identify the use of the space and the occupant load in front of the CFO office and the HR office. The area in front of Offices 201 and 203 shall be considered functional occupiable space unless demonstrated otherwise. Provide an occupant load calculation for this area and include it in the occupant load table on the plans. On the occupant load table, provide a total square footage at the bottom of the column. The total should match the overall floor area shown on the title sheet, 13,413 sq ft. During the DRC, previous emails, correspondence, and meetings indicated that the Workforce Development area has furniture plans showing it functions as a business use rather than an assembly use. However, the submitted plans do not include that sheet. To confirm that this space does not function as assembly, provide the furniture plan for documentation. Conference Rooms 208B and 202M are assembly spaces. Update the occupant load table to reflect these rooms as assembly areas. Specify the occupant load at each exit door. The total occupant load shown at the exits shall match the total occupant load indicated in the area tabulation. Indicate the number of required exits and the number of provided exits on the plan. It appears that existing Stand Number 2 is enclosed by the new wall. Please confirm if this is correct. Since the first floor is occupied by a different tenant than the second floor, show the exit path from Stairway 1, illustrating travel from the second floor to the first floor and from the first floor to the exit doors. Clearly indicate that the exit path for the second-floor tenant is independent from the first-floor tenant. Add up the occupant loads along each egress path as they merge from classrooms into corridors. This cumulative occupant load is required to determine the minimum exit widths along the paths and at the exit doors. Show location of all exit signs on the plan. (1013.1) Provide tactile (raised character and Braille) exit signs in accordance with CBC 1013.4 at all required locations: At each grade-level exterior exit door, provide a tactile sign with the word “EXIT.” At each exit door leading directly to a grade-level exterior exit via a stairway or ramp, provide a tactile sign with the appropriate words: “EXIT STAIR DOWN,” “EXIT RAMP DOWN,” “EXIT STAIR UP,” or “EXIT RAMP UP.” At each exit door leading directly to a grade-level exterior exit via an exit enclosure or exit passageway, provide a tactile sign with the words “EXIT ROUTE.” At each exit access door from an interior room or area to a corridor or hallway, provide a tactile sign with the words “EXIT ROUTE.” At each exit door through a horizontal exit, provide a tactile sign with the words “TO EXIT.” Show the Common Path of Egress Travel Distance (CPETD) on the floor plan. CPETD is measured from the most remote point within a space to the point where separate and distinct access to two exits is provided. Note on plan: The maximum common path of egress travel distance for Group E occupancy with a fire sprinkler system is 75 feet. Indicate this code maximum and show the actual common path of egress travel distance on the plan to demonstrate compliance. Note on plan: The maximum exit access travel distance for Group E occupancy with a fire sprinkler system is 250 feet. Indicate this code maximum and show the actual exit access travel distance on the plan to demonstrate compliance. Dimension the corridor width. It shall not be less than 72 inches where occupant load is 100 or more. (Table 1020.3) Clearly indicate and label the fire-resistance rating for all walls on the plans, specifying whether each wall is non-rated, 1-hour, 2-hour, or other applicable rating.Sheet G4.2 Identify any rooms classified as incidental uses per Table 509.1. If none exist, include a statement: “No rooms classified as incidental uses per Table 509.1.” Sheet ID7.1 (Door Schedule) On the door schedule, specify panic hardware or no lock and no latch on the following doors: STR1-1, 208-1, 208-2, 207-1, 207-2. Revise door note #2 to indicate a minimum door hardware height of 34 inches. Revise door note #1 to indicate a maximum of 15 pounds of force required to open exterior doors. Door Schedule references hardware set DHW#. Provide the corresponding hardware details for this set. Provide note: All egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (1010.2) Structural Review Comments Provide structural calculations for review. End of Comments