HomeMy WebLinkAbout334697_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101125354
PROJECT ADDRESS:
825 N Lacy St
PLAN CHECK ENGINEER:
Meshkat, SeyedyahyaTEL:714
647-5831
EMAIL:
smeshkat@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/22/2025
INITIAL REVIEW
11/10/2025
EXPIRATION
4/20/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Hau Tran
3.
TEL:
(909)239-0403
FAX:
VALUATION: $3,500.00
EMAIL:
thau083333@gmail.com
FLOOD ZONE: X-06059C0163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.
GENERAL COMMENTS:All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
ARCHITECTURAL COMMENTS:
Insert the handwritten note in project data and scope of work into the typed note, hand written notes on plans are not acceptable.
Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation.
Provide the following design data on the first sheet (R106.1.1): Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.
Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.
Sheet index contents, sheet names and call out order should match with the submitted bundled drawings. Revise accordingly and provide sheet names for drawings per sheet index.
Protection wood against decay shall comply with section R317.
Structural Plan Review Comments:
View image sheets in calculations are blank. Additional comments may arise after resubmittal.
Calculations show HSS7x5x0.5 beams while plans call for HSS7x4x0.5. Calculations show grade C for HSS while plans show grade B. Revise accordingly.
Scope of work is to permanently stabilize the structure. Provide complete lateral stability analysis and full load path to foundation for gravity and lateral loads. Support all proposed connections and structural elements with calculations. Consider the effect of proposed improvements on existing structures such as headers, posts, footing, etc. Additional comments may arise.Additional Review Comment:
Red marked comment set is available to pick-up at the City Hall.(End of Comment)