HomeMy WebLinkAbout332069_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101124519
PROJECT ADDRESS:
803 S Orange Ave Unit# 2
PLAN CHECK ENGINEER:
Meshkat, SeyedyahyaTEL:714
5831
EMAIL:
smeshkat@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/31/2025
INITIAL REVIEW
9/8/2025
EXPIRATION
1/27/2026
RECHECKS:
1.11/12/2025
PROJECT APPLICANT CONTACT PERSON:
2.
Luis Canales
3.
TEL:
(714)697-5712
FAX:
VALUATION: $6,500.00
EMAIL:
lucasa.blueprint@gmail.com
FLOOD ZONE: X-06059C0276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Reminder.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.2nd: Clarify the changes on plans and/or calculations made to address corrections. Provide a response letter and explain how did you address the comments.Resubmit corrected sets of plans.2nd: Three sets of plans and calculations are required. Only two sets submitted.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2022 California Building Standards Code with local amendments and to clearly indicate complete and detailed scope of work under this building permit application. Proposed scope of work includes items such as replacing doors and windows which is not part of the intended work that this permit is requested for. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.2nd: Not fully addressed. Plans are still showing the replacement of doors and windows. Remove all the information addressing replacement of existing door and windows with new and clearly call them as existing on plan.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
Reminder.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).
Reminder.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).Reminder.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
Reminder.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Reminder.
Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation.
2nd: Not fully addressed. Add complete note.
Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. MEP are subject to building field inspection.
2nd: Not fully addressed. Add complete note.
Clearly indicate on floor plan the location of existing structures (including walls, stairs, decks, etc.), new structures, and structures to be removed. Please provide Wall Legend. Also, seems like there as an existing deck next to the existing stairs to be demolished, clearly show and call to be demolished on plans.
2nd: Not addressed. Show existing deck next to stairs and call to be demolished.
Exterior stairways shall be provided with an artificial light source located at the top landing of the stairway. Exterior stairways providing access to a basement from the outdoor grade level shall be provided with an artificial light source located at the bottom landing of the stairway. (R303.8)
2nd: Not addressed. Provide and show lighting on plans.
Landing shall not be 1 ½” lower than the top of the threshold when doors swing over the landing or floor; otherwise, landing can be 7 ¾” maximum lower than the top of the threshold. Show landing drop at stair. (R311)
2nd: Not addressed. Show amount of drop on plan.
Stairways: Show minimum 36” clear width, Provide/show 6’-8” clearly headroom above the stairway, Show the dimension of rise and run of stairways on plans. Show 7.75" (203mm) maximum rise and 10" (229mm) minimum run with nosing of ¾” minimum and 1 ¼” maximum.(R311.7.6)
2nd: Not addressed. Show the allowable range for nosing of stair tread.
Handrails shall be provided at least on one side of each continuous run of treads or flight with four or more risers. Show handrails on plan. (R311.7.8)
2nd: Not addressed. Show handrail on floor plan.
Protection wood against decay shall comply with section R317 (no. 8).
2nd: Not addressed. Provide preservative treatment in accordance with AWPA U1.
Provide detail to show exterior wall covering with water-resistive barrier in accordance with Section R703.2.
Balconies, decks and exterior stairway exposed to weather and sealed underneath shall be waterproofed and sloped a minimum of ¼” unit vertical in 12 units horizontal (2%) for drainage. Specify manufacturer and ICC report number of waterproofing on the plan.
2nd: Not addressed. Also, show drainage slope and direction. In addition, structural plans show new framing at landing, revise the landing to show new in lieu of existing call out.
Please see marked-up plans for additional requirement/comments.
Add sheet names to plans.
2nd: Not fully addressed. Add sheet name to sheets B and C to match sheet index.
Add scale to drawings.
2nd: Not fully addressed. Add scale to existing first floor plan.
Existing window at existing bath needs to be infilled to meet requirements of R302.1 for fire rated walls.
2nd: See comment #5.
Structural Plan Review Comments:
Show braced walls in compliance with Section R602.10; otherwise, engineer design is required.
Final plans and calculations are to be stamped, signed and dated by a California licensed architect or California registered civil engineer.
Provide plywood sheathing specification with nail schedule for stair landing and proposed shear walls.
2nd: Not addressed.
Clarify on plane if the footing under the stair walls are new or existing. Revise details accordingly. If new, provide on plan notes showing concrete (fc’ = 2500 psi (min)) and steel reinforcement specifications.
Handrails and guards shall be designed to resist a concentrated load of 200 pounds in accordance with Section 4.5.1 of ASCE 7 (CBC 2022, 1607.9.1.1.). Provide supportive calculations to show compliment.
2nd: Provide connection details per calculations. Please be aware that sketches on calculations will not be presented on construction drawings. Clarify if the posts supporting header at new landing are resisting seismic loads or provide adequate connection/load path to foundation accordingly. Support with calculations. Provide calculations for required pad footings where PBZ post bases are proposed and provide a detail showing all the requirements per manufacturer and calculations. Consider the full height of applied load from point of application to footing in order to calculate applied moment. Provide strap size and detail supported with calculations to tie down the guard wall post to post below where split occurs.
Provide shear transfer and foundation anchorage details as shown in plan markups.
Provide epoxy ICC report.
Provide calculations for the capacity of epoxy to resist uplift load at shear walls edge and call all the required holdown on plans. Consider overstrength factor and 30% increase at post comprising shear walls at both orthogonal directions.
Please see marked-up plans for additional requirement/comments.
2nd: Reminder.
Additional Review Comment:
Red marked comment set is available to pick-up at the City Hall.