PLAN CHECK NO:
101125438
PROJECT ADDRESS:
902 E Washington Ave
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
M
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/3/2025
INITIAL REVIEW
12/9/2025
EXPIRATION
5/2/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Sam Assi
3.
TEL:
(714)280-6908
FAX:
VALUATION: $36,000.00
EMAIL:
wesame_zakery@yahoo.com
FLOOD ZONE: X-06059C0163J
GENERAL REQUIREMENTS
Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law.
This plan check will expire 180 days from the original submittal date unless a written request for extension is submitted and approved prior to expiration. The request must include justifiable cause. The Building Official may approve a one-time extension of up to an additional 180 days. No extensions will be granted beyond 360 days from the original submittal date.
Effective January 1, 2026, the City of Santa Ana will enforce the 2025 California Building Standards Codes for all new plan submittals. Plans submitted prior to this date shall be governed by the 2022 codes; however, any plan check that expires after January 1, 2026, will be required to comply with the 2025 codes.
When submitting corrections, clearly indicate where each change has been made. Reference the applicable sheet number, detail number, or relevant note for every correction to facilitate accurate and efficient review.
This review does not include Mechanical, Electrical, and Plumbing (MEP).
Additional plan check fee will be required after the third review on hourly basis.
Obtain any applicable approval from the following agencies prior to permit issuance:
Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters.
Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters.
Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org.
Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status.
County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance.
School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance.
Cal/OSHA – Check the Cal/OSHA permit requirements here.
INSTRUCTIONS
Plans Pickup
The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit.
Plan Check Corrections
Address all items noted on this plan check report, either directly on this list or in a separate document.
Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response.
If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org.
Resubmittal
Resubmit the red-marked plans and calculations, if applicable.
Resubmit your responses to corrections.
Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set.
Resubmit all construction documents using one of the following options:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit.
Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins.
Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment.
PLAN REVIEW COMMENTS
Sheet G010
Provide a 9" x 9" blank space near the bottom-right corner of the title sheet, outside the title block, for the City approval stamps.
Revise the occupancy classification to Group M to reflect the use as a mini-market.
Sheet I120
Provide documentation confirming that all walk-in cooler/freezer doors are equipped with a functioning internal safety release mechanism or panic bar, allowing the doors to open from the inside at all times, even when locked from the outside.
Confirm if the walk-in cooler is intended for customer use. If so, it must comply with all applicable California Building Code (CBC) accessibility requirements, including door width, maneuvering clearance, opening force and handle type.
Show a note on the plans confirming insulation thickness. If the insulation exceeds four inches, provide a thermal barrier per CBC 2603.4; if it is four inches or less, indicate that the thickness is within limits.
Submit manufacturer's product data sheets for the foam plastic insulation used in the panels. The insulation must demonstrate a flame-spread index of 25 or less and a smoke-developed index of 450 or less when tested in accordance with ASTM E 84 or UL 723. (CBC 2603.5.4)
Provide a structural connection between the walk-in unit and the foundation. Include fastener type, spacing, and minimum embedment.
Red Marks
There are no additional red marks on the plans. All comments in this written report address the plan review issues. You may pick up the original plans if desired, but it is not required.
End of Comments