Loading...
HomeMy WebLinkAbout331273_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101124295 PROJECT ADDRESS: 1131 W Highland St Unit# G PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/9/2025 INITIAL REVIEW 8/8/2025 EXPIRATION 1/5/2026 RECHECKS: 1.10/17/2025 PROJECT APPLICANT CONTACT PERSON: 2. Armando Antunes 3. TEL: (951)847-1996 FAX: VALUATION: $75,000.00 EMAIL: michael@mccormickconst.com FLOOD ZONE: X-06059C0257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet K2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (JULY 2024 SUPPLEMENTAL) shall be completed by applicant and provided in drawing set. Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”.PC #2: Ratio and note not found, please verify location. Provide the following design data on the first sheet (R106.1.1) ☐Sheet Index ☒Occupancy groups R-2 ☐Type of construction ☐Automatic Fire Sprinkler (YES or NO) ☐Number of stories. ☒Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☐Floor area per occupancy group, including the existing structure(s) ☒Construction shall comply with the 2022CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions. PC #2: Please note incorrect code reference applied. CRC shall not apply to proposed ADU as existing is attached to an R-2 Occupancy. All items herein shall apply solely to the 2022 California Building Code. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection.Sheet A-1 Provide a Site Drainage plan with the following information, but not limited to: Location of all existing and proposed structures, property lines, right-of-way lines, and easements, including dimensions and setbacks Drainage slopes and flow patterns Drainage system such as swales, french drains, water collection and disposal system, etc. Drainage plan shall indicate how the site grading or drainage system will manage all surface water flows to be diverted away from buildings and adjoining property lines, in accordance with all applicable codes The grade shall fall not fewer than 6 inches within the first 10 feet from the foundation wall. Where lot lines, walls, slopes or other physical barriers prohibit 6 inches of fall within 10 feet, drains, or swales shall be constructed to ensure drainage away from the structure. Impervious surfaces within 10 feet of the building foundation shall be sloped not less than 2 percent away from the building. (R401.3 CRC)Sheet A-2Walls between 2’-0” and 5’-0” from property line shall be 1-hour fire rated on both sides. Specify on plan where required and provide detail for proposed rated system.PC #2: Wall between 5’-0” to 10’-0” from PL shall be fire rated per 2022 CBC Sec. 705. Specify walls requiring fire rated and reference detail.Verify all walls are new, revise hatch as needed per legend.Provide landing dimensions at door.Verify section sheet reference, sheet # does not look correct. Penetrations in wall or floor/ceiling assemblies in two-family dwellings shall comply with Section R302.4. Provide complete details on the plans. Sheet A-4Provide section label for all Building Sections.Sheet S-1Verify shearwall label at Framing Plan along Grid 1. Does not match calculations.Provide moisture barrier at existing slab on grade. ICC approved product shall be used, specify product and ICC approval # on drawings.Wall hatch in Framing Legend does not match Plans. Revise to match. Additional PC #2 Comments:Sheet SD-1 & SD-2Sheets shall be signed by EOR.(End of Comment)