Loading...
HomeMy WebLinkAbout334606_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101125331 PROJECT ADDRESS: 1851 E Deere Ave PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): A-2, B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/21/2025 INITIAL REVIEW 10/26/2025 EXPIRATION 4/19/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Randy Fair 3. TEL: (562)897-0426 FAX: (562)602-2081 VALUATION: $96,000.00 EMAIL: randy@csaconstructors.com FLOOD ZONE: X-06059C0278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A001 Provide a Site Drainage plan with the following information, but not limited to: Location of all existing and proposed structures, property lines, right-of-way lines, and easements, including dimensions and setbacks Sheet S101Verify new AC unit weight with mechanical drawings. Weight does not match. (1200# on M Sheets)Sheet S200Detail 3 – Provide flashing information/detail around new platform.CalculationsProvide new unit spec/cutsheet for weight justification.Verify curb/platform weights are considered in existing framing calculations. (End of Comment)