Loading...
HomeMy WebLinkAbout335764_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101125669 PROJECT ADDRESS: 1910 E Warner Ave Unit# A PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/25/2025 INITIAL REVIEW 12/3/2025 EXPIRATION 5/24/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nathan Menard 3. TEL: (714)552-2722 FAX: VALUATION: $1,000.00 EMAIL: nathan@menarch.com FLOOD ZONE: X-06059C0279J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☐Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationPath of travel upgrade shall be completed as needed per CBC 11B-202.4. Please print and complete city Disabled Access Compliance form. [https://www.santa-ana.org/documents/disabled-access-compliance-and-unreasonable-hardship-form-2022/]Remove Suite B from addresses noted on Cover sheet and title block. New address shall be noted only.DrawingsSheet CSNote in Scope of Work combining existing “Unit A” and “Unit B” suites to single “Unit A”.Type of construction shall be updated to current VB occupancy.Sheet SPShow parking symbol on accessible spots on plan. Sheet GN.1Cal Green Building Standards Code shall be updated to latest July 2024 Supplement version.Applicant to complete checklist, various items remain empty.Sheet A1Provide single occupancy calculation for new proposed unit.Show path of travel throughout new single unit.Provide accessible door requirements per CBC 11B-404.Remove Unit B on proposed floor plan, there is no longer a Unit B.Door to storage that provides access to accessible restroom shall meet all accessible door requirements and be noted on drawings. (End of Comment)