Loading...
HomeMy WebLinkAbout336869_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101126014 PROJECT ADDRESS: 3501 W Sunflower Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/17/2025 INITIAL REVIEW 1/7/2026 EXPIRATION 6/15/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bryan Monyoya 3. TEL: (949)251-1710 FAX: VALUATION: $80,000.00 EMAIL: bryan@cadtronics.net FLOOD ZONE: X-06059C0258J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)PLAN CHECK COMMENTSRevise the project address to “3501 W Sunflower Ave, Santa Ana CA 92704”. Please ensure the correct address is updated throughout the construction document. For example, address on the title block of every sheet, title page on structural calculations, and line 3 on page 1 of the CF1R document.Sheet T1. Update building type of construction to type V-B.Please pick up submitted plans.Please refer to correction comments marked on the drawings. Refer to redlines on sheet A2 and A3 to clarify and show applicable details that referenced on the legends or notes. END OF COMMENTS