Loading...
HomeMy WebLinkAbout337010_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102126057-58 PROJECT ADDRESS: 409 E Bishop St, 411 E Bishop St PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/23/2025 INITIAL REVIEW 1/7/2026 EXPIRATION 6/21/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Victor Rios 3. TEL: (714)788-9836 FAX: VALUATION: $10,000.00 EMAIL: vicrios9620@gmail.com FLOOD ZONE: X-06059C0276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.Documentation All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. Add main residence address to Title Block on all sheets. There is work being permitted on both addresses.DrawingsSheet 1 Provide the following design data on the first sheet (R106.1.1) ☐Sheet Index ☐Occupancy groups (R-3/U) ☐Type of construction (V-B) ☐Automatic Fire Sprinkler (YES or NO) ☐Number of stories. ☒Flood Zone: X ☐Flood Zone: A ☐Flood Zone: AE ☐Floor area per occupancy group, including the existing structure(s) ☐Construction shall comply with the 2022 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions. Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet.  Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”. Note on plan: All concealed work installed without permits must be exposed for inspection to the satisfaction of the Building Inspector. This includes methods of attachment and all footings, structural members, mechanical, electrical, plumbing and insulation. Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection.Specify any AC unit/condenser for ADU on plan. Exterior walls located less than 5-ft from a property line shall be of one-hour construction. Specify on Site Plan when required and provide details for proposed system. Fire rated system shall be on both exterior and interior side of wall and extend from foundation to underside of roof sheathing. Specify on plan where required and provide/reference detail for proposed fire rated system. Means of egress / Doors – (R311) ☒On the plan, provide a landing or floor on each side of each exterior door. Landing shall have width of not less than the door served and a minimum of 36” measured in the direction of travel. ☒Landing shall not be 1 ½” lower than the top of the threshold when doors swing over the landing or floor; otherwise, landing can be 7 ¾” maximum lower than the top of the threshold. Provide window numbers to match window schedule on plans. Typ all windows.Existing windows in Bedroom #4 do not meet egress requirements. Windows shall be revised as needed to meet emergency egress requirements.Clear text overlay found on Door Schedule.Please enlarge text provided between Project Data and Analysis Area.Revise Scope of Work to specify legalizing garage to ADU conversion.Update Sheet Index to include all sheets provided in drawing set.Sheet SHT6 not found in drawings. Green Code sheets shall be provided and updated to July 2024 Supplement version.Provide framing plan, details, and calculations for patio covers at house and ADU. The following Electric Ready notes shall be added and constructed for new detached residential structures: Water Heating system (water heater) – (Section 150.0(n)) Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n). If the designated space is within 3 feet from the water heater: A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater. ii. Isolate both ends of the unused conductor. A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker A condensate drain that allows natural draining of the water heater. . If the designated space is more than 3 feet from the water heater: see additional Code requirements. When a second water heater is installed as part of the addition shall comply with Section (150.2(a)(D). Sheet 3Ensure handwritten items are provided in Re-submittal (e.g. Holdowns)Provide Braced Panel each end of Braced Wall, else provide calculations.Provide building sections to show building envelope, including wall, floor, and roof/ceiling insulation, per Title 24 calculation.Provide new ceiling joist connection details.Verify existing framing and slope provided. It is unclear how slope direction works perpendicular to existing roof framing.Provide existing roof framing size and spacing.Provide holdown at ea side of corner post where shearwall occurs on each orthogonal side. Else provide calculation justifying uplift with shearwall in each direction.Verify where proposed ceiling joist occurs at mono slope roof. Specify attic access and provide attic ventilation calculation as required.Handwritten holdown callouts are unclear, please ensure holdown types are clearly specified in print format.For existing footing assumption, it is recommended to provide detailing for condition where existing footing is found to not meet minimum dimensions or does not occur at all. Many existing garages have been found to not have foundations on site, stopping work and requiring revisions.Detail 1 and 2 – Provide dimension for rebar clearance on details.Detail 3 – Provide ICC Approval #. Verify product provided, Set-XP has been discontinued.Detail 3 – Verify note specific 24” d footing and 18” deep footing. (End of Comment)