HomeMy WebLinkAbout337249_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101126137
PROJECT ADDRESS:
1403 N Tustin Ave Unit# 160
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/8/2026
INITIAL REVIEW
1/9/2026
EXPIRATION
7/7/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Eberth Alvarado
3.
TEL:
(818)231-4202
FAX:
VALUATION: $45,000.00
EMAIL:
frconstruction.design1@gmail.com
FLOOD ZONE: X-06059C0164J
GENERAL REQUIREMENTS
Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law.
This plan check will expire 180 days from the original submittal date unless a written request for extension is submitted and approved prior to expiration. The request must include justifiable cause. The Building Official may approve a one-time extension of up to an additional 180 days. No extensions will be granted beyond 360 days from the original submittal date.
As of January 1, 2026, the City of Santa Ana enforces the 2025 California Building Standards Codes. Previous code editions, including the 2022 codes, are no longer applicable.
When submitting corrections, clearly indicate where each change has been made. Reference the applicable sheet number, detail number, or relevant note for every correction to facilitate accurate and efficient review.
This review does not include Mechanical, Electrical, and Plumbing (MEP).
Additional plan check fee will be required after the third review on hourly basis.
Obtain any applicable approval from the following agencies prior to permit issuance:
Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters.
Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters.
Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org.
Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status.
County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance.
School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance.
Cal/OSHA – Check the Cal/OSHA permit requirements here.
INSTRUCTIONS
Plans Pickup
The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit.
Plan Check Corrections
Address all items noted on this plan check report, either directly on this list or in a separate document.
Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response.
If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org.
Resubmittal
Resubmit the red-marked plans and calculations, if applicable.
Resubmit your responses to corrections.
Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set.
Resubmit all construction documents using one of the following options:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit.
Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins.
Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment.
PLAN REVIEW COMMENTS
Sheet A1.0
This building plan check does not include the Mechanical, Electrical, and Plumbing (MEP) review. Update the sheet index to either reflect the removal of MEP sheets or reference 'Per Separate MEP Permits.'
The engineer's stamp shows an expiration date of 2025, which has expired. Update the expiration date on the stamp and ensure the updated stamp is applied on the drawings.
Under the project directory section, include the architectural designer’s name and contact information.
Under Applicable Codes, reference the 2025 Code Edition rather than the 2022 Edition. In addition, update the code edition under plumbing section and CalGreen section.
Clarify whether an energy storage system is proposed. It is referenced under deferred submittals but not shown on the plans.
Add the following note: “Fire sprinkler drawings shall be submitted and approved by the Orange County Fire Authority (OCFA) prior to the final of the building permit.”
Clarify fire sprinkler information on the plans. For the existing conditions and the proposed scope of work, indicate the following:
Existing Fire Sprinkler System: Yes or No
Proposed Fire Sprinkler System: Yes or No
Modified Existing Fire Sprinkler System: Yes or No
Specify the occupancy group.
Verify whether the proposed scope of work includes a change of occupancy. If a change of occupancy is proposed, clearly identify on the plans the occupancy classification(s), showing the existing occupancy and the proposed occupancy. If no change of occupancy is proposed, add a note on the plans stating: "No change of occupancy is proposed."
Indicate the occupancy group of the adjacent tenants—both above and next to this tenant space. Specify the required fire-resistance rating for occupancy separation walls and floors in accordance with CBC Table 508.4.
Sheet A1.1
Graphically show an exterior accessible path of travel (e.g. dashed line) from the accessible parking spaces to the building entrance.
Identify any conditions along the path of travel that do not comply with accessibility standards, and provide construction details showing how they will be corrected.
Show full compliance of the exterior accessible path of travel with CBC Chapter 11B. Indicate surfaces, slopes, clearances, widths, protruding objects, and changes in level.
Sheet A2.0
Provide clear hallway dimensions demonstrating compliance with maneuvering clearance at doors. A minimum 60-inch clearance is required at the door location. (CBC §11B-404.2.4)
The floor plan shows Suite 160 only. Identify the restroom serving Suite 160, show the travel distance to the restroom, and provide restroom details demonstrating accessibility compliance.
Structural Sheets
The engineer on record shall stamp and sign all structural sheets.
End of Comments