PLAN CHECK NO:
101126338
PROJECT ADDRESS:
510 S Main St
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830
EMAIL:
aso@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
M
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/27/2026
INITIAL REVIEW
2/24/2026
EXPIRATION
7/26/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Yadira Rostro
3.
TEL:
(714)499-4083
FAX:
VALUATION: $2,500.00
EMAIL:
yadirarostro72@icloud.com
FLOOD ZONE: X-06059C0276J
GENERAL REQUIREMENTS
Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law.
This plan check will expire 180 days from the original submittal date unless a written request for extension is submitted and approved prior to expiration. The request must include justifiable cause. The Building Official may approve a one-time extension of up to an additional 180 days. No extensions will be granted beyond 360 days from the original submittal date.
As of January 1, 2026, the City of Santa Ana enforces the 2025 California Building Standards Codes. Previous code editions, including the 2022 codes, are no longer applicable.
When submitting corrections, clearly indicate where each change has been made. Reference the applicable sheet number, detail number, or relevant note for every correction to facilitate accurate and efficient review.
This review does not include Mechanical, Electrical, and Plumbing (MEP).
Additional plan check fee will be required after the third review on hourly basis.
Obtain any applicable approval from the following agencies prior to permit issuance:
Planning Division – The plans approved by the Building Division must include the Planning approval stamp. Building staff will notify the Planning Division for approval. For approval status, contact the Planning Division at (714) 647-5804 or visit the Planning Division counters.
Public Works Agency (PWA) – Obtain PWA clearance if any of the following applies: project valuation exceeds $30,000, project has added plumbing fixtures, added bedrooms, or project exceeds 500 square foot in new construction (not renovation). After the Building Division approves your project, visit the Building Division counters and request a copy of the approved plan. Bring the approved plan to the PWA counters for approval. After PWA approves your project, return the approved plan to the Building Division counters.
Police Department (PD) – The plans approved by the Building Division must include the PD approval stamp. After the Building Division approves your project, Building staff will notify PD for approval. For approval status, contact the PD at (714) 647-5840 or email PolicePlanCheck@santa-ana.org.
Orange County Fire Authority (OCFA) - Submit plans to OCFA immediately if you answer “Yes” to any part of questions 1 through 10 on the plan submittal criteria. Bring an OCFA approved plan to the Building Division counters for permit issuance. Contact OCFA for approval status.
County of Orange, Health Care Agency, Environmental Health (OC Health) – Submit plans to OC Health if the business involves food service. Contact OC Health for submittal requirements. If OC Health approval is required, bring an OC Health approved plan to the Building Division counters for permit issuance.
School District – After the Building Division approves your project, Building staff will send a School Fee Form to your school district if school fee applies to your project. Applicant shall pay the school fee and bring the signed Certificate of Compliance form to the Building Division counters for permit issuance.
Cal/OSHA – Check the Cal/OSHA permit requirements here.
INSTRUCTIONS
Plans Pickup
The original plans and calculations are available for pickup at the building division counters on a walk-in basis. No appointment is necessary. Please check the holiday closure schedule before planning your visit.
Plan Check Corrections
Address all items noted on this plan check report, either directly on this list or in a separate document.
Address each correction thoroughly and provide a complete response. Do not leave any blanks. Indicate the sheet number, detail number, or note number where you make each correction. If a plan check correction does not apply to your project, provide an explanation in your response.
If you have any questions, contact Senior Plan Check Engineer Anson So at 714-647-5830 or by email at aso@santa-ana.org.
Resubmittal
Resubmit the red-marked plans and calculations, if applicable.
Resubmit your responses to corrections.
Resubmit two corrected sets of construction documents, including plans, structural calculations, energy documents, soils report, and any other related documents. For new construction or additions, provide an additional corrected set.
Resubmit all construction documents using one of the following options:
Resubmittal Bin:Complete the Plan Check Re-Submittal Form and include it with your resubmittal. The resubmittal bin is located at the building division lobby. Check the holiday closure schedule before your visit.
Walk-ins:Resubmittals are accepted on a first-come, first-served basis during daily walk-in hours. However, scheduled appointments take priority over walk-ins.
Appointment:Call the building division at 714-647-5800 to schedule a resubmittal appointment.
PLAN REVIEW COMMENTS
Sheet A0.0
Provide a 9" x 9" blank space near the bottom-right corner of the title sheet, outside the title block, for the City approval stamps.
Provide a sheet index.
A handwritten note indicates the project address on the plan. Incorporate the project address into the final printed drawings and resubmit.
Provide a detailed scope of work on the plans. Specify the number of storage racks, rack height, and total rack length. Replace the term “metal shelves” with “storage racks” throughout the plans.
Provide a vicinity map.
Provide the engineer’s stamp and signature on all structural sheets.
Provide a project directory that includes the names and contact information of the property owner, tenant, and all design professionals involved in the project (architectural, structural, civil, geotechnical, mechanical, electrical, and plumbing).
Provide a note indicating that this project shall comply with the 2025 California Building Code (CBC).
List all deferred submittals on the plans. If there are none, clearly indicate “No deferred submittals.”
Include the following note on the plan: 'All Notice of Violation items must be fully addressed. Partial compliance will not be accepted. All unpermitted work must be brought into full compliance.'
Provide the following building data as required by the 2025 California Building Code: occupancy group, type of construction, number of stories, height, floor area, and whether the building is equipped with a fire sprinkler system.
Clarify fire sprinkler information on the plans. For the existing conditions and the proposed scope of work, indicate the following:
Existing Fire Sprinkler System: Yes or No
Proposed Fire Sprinkler System: Yes or No
Modified Existing Fire Sprinkler System: Yes or No
Specify the type of construction in accordance with Chapter 6 of the 2022 California Building Code.
Specify the occupancy group in accordance with Chapter 3 of the 2022 California Building Code.
Verify whether the proposed scope of work includes a change of occupancy. If a change of occupancy is proposed, clearly identify on the plans the occupancy classification(s), showing the existing occupancy and the proposed occupancy. If no change of occupancy is proposed, add a note on the plans stating: "No change of occupancy is proposed."
List all required special inspections for this project. If none are required, state “No special inspections required” on the plans.
Sheet A1.0
High-pile storage is defined as storage exceeding 12 ft in height. Note on the plans whether the building will be used for high-pile storage (Yes or No). If high-pile storage is proposed, submit plans to OCFA for review and approval.
Provide a note on plans stating that storage racks shall be installed plumb. The maximum tolerance from the vertical is 0.5 inches in 10 feet of rack height. (RMI 1.4.11.1)
Provide a note on the plans stating that the design, testing, and utilization of storage racks shall conform to Rack Manufacturers Institute (RMI) specifications.
Provide material specifications for concrete, steel, welds, and bolts.
Note on the plans that a minimum clear space of 18 inches shall be maintained between the top of storage and sprinkler deflectors.
Provide minimum aisle widths of 44 inches between storage racks in accordance with CBC 11B-403.5.1.
Identify on the floor plan the location(s) of the permanent load plaque(s), and provide permanent load plaque(s) with a minimum area of 50 square inches in one or more conspicuous locations at the storage rack installation. (RMI 1.4.2)
Confirm whether structural field welding is proposed. If provided, list structural field welding under the Special Inspection requirements and specify either periodic or continuous inspection.
List post-installed anchor bolts under the Special Inspection requirements and specify either periodic or continuous inspection.
Confirm anchor bolts are existing and installed. Provide engineer’s justification for compliance with special inspection requirements per CBC Chapter 17.
Provide structural plans, details, and calculations prepared by a California-licensed civil/structural engineer for the storage rack installation.
Show the storage rack configurations, including permissible configurations, maximum number of shelves, maximum spacing between shelves, and maximum distance from the floor to the bottom shelf. (RMI 1.4.5)
Provide protection for the lower portions of rack posts exposed to forklift or equipment traffic, particularly front posts facing aisles. Show details demonstrating post strengthening, such as welded twin columns, angle deflectors at aisle-side posts, heavier horizontal or diagonal bracing, and/or enlarged base plates and anchors. (RMI 1.4.9)
Provide base plate width, length, thickness, and center-to-center spacing of anchor bolts.
Specify the number of anchor bolts; bolt diameter; embedment depth; epoxy product name and model; ESR report number; and minimum edge distance.