HomeMy WebLinkAbout338008_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101126360
PROJECT ADDRESS:
3411 W Maywood Ave
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, F-1, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/28/2026
INITIAL REVIEW
2/1/2026
EXPIRATION
7/27/2026
RECHECKS:
1.2/24/26
PROJECT APPLICANT CONTACT PERSON:
2.
Sean Maddocks
3.
TEL:
(949)291-0587
FAX:
VALUATION: $50,000.00
EMAIL:
Maddocks@greencp.com
FLOOD ZONE: X-06059C0258J
APPLICABLE CODE: 2025 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide complying exiting plan for the building.OK 2/ 24/26EXIT DISCHARGE. That portion of a means of egress system between the termination of an exit and a public way.Pending 2/24/26 Show man door at the parking gate per permit #101104511Provide on the drawings a complete door schedule, showing:
- Door sizes
- Hardware complying with exiting and disabled accessibility requirements Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.” Provide for the new security doors.Pending 2/24/26 Provide type of the hardware for both door D02 & D03.Identify exit doors and entrances on the floor plan and the site plan.Pending 2/24/26 , show new screen door.All doors require a level floor landing on each side in accordance with CBC Sections 1008.1.4, 1008.1.5, 1008.1.6, and 1133B.2.4 and CBC Figures 11B-26A and 11B-26B. Provide typical door threshold details and details of change in floor covering material.OK 2/ 24/26Hand-activated door opening hardware shall be centered between 34” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.OK 2/ 24/26Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Exit illumination and exit sign requirements in accordance with CBC Section 1013 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.OK 2/ 24/26Note on the plans type of the materials are being stored in the altered area.OK 2/ 24/26Provide elevation for exterior security screen door.OK 2/ 24/26Provide specifications for the exterior security screen ( door # D02)OK 2/ 24/26Please clarify if new interior security door ( door # D02) is in a new opening or it is replacement for the existing door.OK 2/ 24/26Is there any card reader? If it is show new card reader complies with CBC 2025OK 2/ 24/26 2/24/26For screen doors specs that showed on this review, provide 60” landing for the screen door.Provide 48” clearance between door D01 and door D03 for doors in the series.