HomeMy WebLinkAbout339001_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 104126672 PROJECT ADDRESS: 2909 S Tech Center Dr PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/24/2026 INITIAL REVIEW 2/25/2026 EXPIRATION 8/23/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Omar Deen 3. TEL: (714)600-5040 FAX: VALUATION: $700,000.00 EMAIL: omardeen714@gmail.com FLOOD ZONE: X-06059C0278J GENERAL REQUIREMENTS Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law. This plan check will expire 180 days from the original submittal date unless a written request for extension is submitted and approved prior to expiration. The request must include justifiable cause. The Building Official may approve a one-time extension of up to an additional 180 days. No extensions will be granted beyond 360 days from the original submittal date. Effective January 1, 2026, new plan submittals shall comply with the 2025 California Building Standards Codes. Submittals prior to this date shall comply with the 2022 codes. When submitting corrections, clearly indicate where each change has been made. Reference the applicable sheet number, detail number, or relevant note for every correction to facilitate accurate and efficient review. This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. Obtain approvals from the following agencies, as applicable, prior to permit issuance: Planning Division – Provide Planning approval stamp on the plans. After Building approval, plans will be routed to Planning by Building staff. Police Department (PD) – Provide PD approval stamp on the plans. After Building approval, plans will be routed to PD by Building staff. Public Works Agency (PWA) – Obtain PWA clearance when applicable. After Building approval, obtain Building-approved plans and submit to PWA. Return PWA-approved plans to Building prior to permit issuance. Orange County Fire Authority (OCFA) – Submit plans directly to OCFA when required. Provide OCFA approval prior to permit issuance. County of Orange Health Care Agency (OC Health) – Submit plans directly to OC Health when food service is proposed. Provide OC Health approval prior to permit issuance. School District – Pay applicable school fees after Building approval. Provide the signed Certificate of Compliance prior to permit issuance. Cal/OSHA – Verify whether a Cal/OSHA permit is required and obtain approval when applicable.Submit plans directly to the Orange County Fire Authority (OCFA) for review and approval. Provide the OCFA Service Request (SR) number as proof of submittal. RESUBMITTAL INSTRUCTIONS Plans Pickup Original plans and calculations are available for pickup at the Building Division counter. Check the Building Division website for counter hours and the closure schedule prior to your visit. Plan Check Corrections Provide a written response addressing all items in this plan check report. Provide a complete response to each comment. Indicate the sheet number, detail number, or note number where each correction is made. If a comment does not apply, provide an explanation. For questions, contact Senior Plan Check Engineer Anson So at aso@santa-ana.org or 714-647-5830. Resubmittal Provide two sets of revised construction documents (drawings, calculations, and supporting documents). For new construction or additions, provide one additional set. Resubmit all construction documents using one of the options below. Option 1: Resubmittal Bin Complete the Plan Check Re-Submittal Form and include it with the resubmittal package. The Resubmittal Bin is located in the City Hall Ross Annex lobby. Option 2: Walk-ins Daily walk-ins are available for resubmittals on a first-come, first-served basis.PLAN REVIEW COMMENTSheet T-1 Provide a 9" × 9" blank space near the bottom-right corner of the title sheet, outside the title block, for City approval stamps. This building plan review does not include Mechanical, Electrical, or Plumbing (MEP). Remove all MEP sheets from the Sheet Index. Revise the Scope of Work on the plans to clearly describe the proposed project. Include the following items:Change of use from warehouse to cannabis cultivation, distribution, and non-volatile manufacturing.Change of occupancy from Group B and S-1 to Groups B, S-1, and F-1.Tenant improvement of ___ square feet.Addition of ___ square feet on the second floor.The previously expired building permit No. 101101868 shows 13,160 square feet of tenant improvement. Verify and confirm the tenant improvement area under this permit. The previous plans show a 4,873 square foot addition, while the current plans show 4,666 square feet. Provide before-and-after plans to reconcile these areas. Revise the project address to include the directional prefix “S.” Verify the exact address with the Planning Division. Update the address on the title sheet, every title block, and throughout all construction documents to ensure consistency. On the title sheet, include the name and contact information for both the tenant and the landlord.Under Project Data, clarify what 2025 CFG refers to. Revise the plans to identify the full code name.Add the following note under Deferred Submittals: “Fire sprinkler drawings shall be submitted to and approved by the Orange County Fire Authority (OCFA) prior to final approval of the building permit.” Add the following note under Deferred Submittals:“Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge for review. The design professional shall forward the reviewed documents to the building official with a notation indicating that the deferred submittal documents have been reviewed and found to be in general conformance with the design of the building. Deferred submittal items shall not be installed until the deferred submittal documents have been approved by the building official.” Include the following note on the plan: 'All Notice of Violation items must be fully addressed. Partial compliance will not be accepted. All unpermitted work must be brought into full compliance.'The plans indicate the building as 1 story + mezzanine under Building Height and Number of Stories. With the proposed addition of the second floor, the upper level no longer qualifies as a mezzanine per the code definition. Revise the building data to identify the building as 2 stories.Revise the allowable building height under Building Height in accordance with CBC Table 504.3.Remove the expired plan check numbers 10198338 and SR277346 from the plans.Revise the allowable area calculations. Buildings “5” and “6” appear to be physically one building with a combined area of 16,697 square feet (8,299 + 8,398). Verify whether a fire wall per CBC definition separates the two buildings or whether Building 6 has the same occupancy. Provide a revised allowable area analysis in accordance with CBC Section 508.3, and clearly demonstrate that the allowable area exceeds the actual building area.Verify and confirm the square footage shown under the Building Data section. The existing and proposed first floor both show 6,622 square feet, whereas the previously approved tenant improvement shows 13,160 square feet. Revise the plans as necessary to reconcile these areas.The building application indicates a second floor addition of 4,666 square feet, while the plans show 5,203 square feet. Verify and confirm the correct second floor addition area and revise the plans or application as necessary.Remove the old clouds and deltas from the site plan. This is not a revision set. Provide the keynotes and legends for all referenced symbols and callouts.Sheet A-4 Provide a complete exit analysis demonstrating compliance with CBC Chapter 10. Show occupant load, number of required exits, required egress width, travel distance, common path of egress travel, dead-end corridors, and exit separation. Provide a path of egress travel diagram from exit access to exit discharge. Show occupant load tables, egress width calculations, door swing direction, and exit sign locations on the plans. Show the total occupant load on the table. Show the path of egress travel and indicate the cumulative occupant load along the egress path as occupant loads from individual rooms combine. (1005.3) Provide required stair egress width calculations based on the cumulative occupant load served and demonstrate the provided stair clear width is not less than the required width. (1005.3) Provide the maximum overall diagonal dimension of the building and demonstrate the required exit separation. (1007.1.1)Provide a tactile exit sign at each exit door leading directly to a grade-level exterior exit via a stairway, with the appropriate words “EXIT STAIR DOWN,” or “EXIT STAIR UP”. (1013.4) Show the Common Path of Egress Travel Distance (CPETD) from the Room 206. CPETD is measured from the most remote point within a space to the point where separate and distinct access to two exits is provided. Per CBC Table 1006.2.1, the maximum common path of egress travel distance for a factory occupancy with a fire sprinkler system is 100 feet. Indicate this code maximum and show the actual common path of egress travel distance on the plan to demonstrate compliance. Show the exit access travel distance on the floorplan in accordance with CBC Section 1017.3. Show the exit access travel distance on the floor plan and indicate both the actual travel distance and the maximum allowable travel distance. (1017.3) End of Comments