HomeMy WebLinkAbout336375_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 102125855 PROJECT ADDRESS: 1810 S Broadway PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/4/2025 INITIAL REVIEW 12/23/2025 EXPIRATION 6/2/2026 RECHECKS: 1.3/16/26 PROJECT APPLICANT CONTACT PERSON: 2. Ida Dashti 3. TEL: (949)292-8559 FAX: VALUATION: $50,000.00 EMAIL: idadashti4@gmail.com FLOOD ZONE: X-06059C0276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).Pending 3/16/26, all pages shall be signed by the responsible person. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Indicate detail and section references as to their appropriate location on the framing plan.OK 3/16/26 Carbon monoxide alarm and smoke detector shall be provided for all required area ( including sleeping room, outside of sleeping area)Pending 3/16/26, any alteration over $1000 required Carbon monoxide and smoke detector On elevation plan, verify if balcony for both sides are being replaced and show all the railings that ae being replaced.OK 3/16/26 Sheet A-3, please specifically identify which members are being replaced due to termite damage. ( Engineering calculation might be required)OK 3/16/26 Sheet S2.0, identify dashed lines, ( Is it wall or roof?)OK 3/16/26 What is the depth of the balcony.OK 3/16/26 Sheet S2.0, is there any privacy wall? Show on the plan and if there is provide construction detail for new privacy wall.OK 3/16/26 Sheet S2.0, identify which members are new and which members are existing.OK 3/16/26 Sheet S2.0, is Glu lam beam new? provide calculation for GLB, and show how supported each side.OK 3/16/26 Provide detail to show how guard rail attached to the Glu lam beam. OK 3/16/26 Show both 2nd floor and 3rd floor framing plan, since guard rails replaced on both floors.OK 3/16/26 Show detail for balcony railing from sheet S3.0 on the framing plan.Pending 3/16/26, Provide detail for guard rail on east and west side. Sheet S3.0, balcony railing section 4x4 post is notched provide calculation for actual size (2.5”)OK 3/16/26 Provide calculation to justify 2x member can take the shear and tension, provide complete detail to prevent tension and shear, please see redmark.Pending 3/16/26, how would the load transfer to the members. How would through bolts installed with existing blocking. Provide strap and blocking to transfer the load to the existing members. (any straps?)