HomeMy WebLinkAbout336444_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
101125875
PROJECT ADDRESS:
3030 S Susan St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812
EMAIL:
Kahangian@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
A-2, B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/9/2025
INITIAL REVIEW
12/20/2025
EXPIRATION
6/7/2026
RECHECKS:
1.2/5/26
PROJECT APPLICANT CONTACT PERSON:
2.
Edgar Parra
3.
TEL:
(626)315-2621
FAX:
VALUATION: $125,000.00
EMAIL:
edgar@thecitysolutions.com
FLOOD ZONE: X-06059C0258J
APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)(FOR HIGH PILED STORAGE RACK)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance Note on the Floor Plan; type and quantity of the material that are being stored on the storage racks.Ok 2/5/26Show depth of the storage rack is minimum 48”, per calculation.Ok 2/5/26The City of Santa Ana will accept the city of Los Angeles Bulletin 2023-100, using a 500 Psf baring pressure for slab- on -grade vertical load design. Please revise calculation accordingly.Pending 2/5/26, Per structural design a minimum of 57.52” x 57.52” of soils area required at each storage rack column please show on the drawings .( show dimension for the adjacent posts)Make a note on the drawings “ location of storage rack columns are not adjacent to construction joints or cold joints .”