Loading...
HomeMy WebLinkAbout340539_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101127144 PROJECT ADDRESS: 1325 E Dyer Rd PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830 EMAIL: aso@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/9/2026 INITIAL REVIEW 5/6/2026 EXPIRATION 10/6/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Marshall Young 3. TEL: (714)241-3800 FAX: VALUATION: $80,000.00 EMAIL: myoung@everesthotelgroup.com FLOOD ZONE: X-06059C0278J GENERAL REQUIREMENTS Before approval for code compliance or issuance of a building permit, the plans and specification for this construction require the information, revisions and corrections indicated below. The approval of plans and specifications does not permit the violation of any section of the building code, or other ordinance or state law. This plan check will expire 180 days from the original submittal date unless a written request for extension is submitted and approved prior to expiration. The request must include justifiable cause. The Building Official may approve a one-time extension of up to an additional 180 days. No extensions will be granted beyond 360 days from the original submittal date. Effective January 1, 2026, new plan submittals shall comply with the 2025 California Building Standards Codes. Submittals prior to this date shall comply with the 2022 codes. When submitting corrections, clearly indicate where each change has been made. Reference the applicable sheet number, detail number, or relevant note for every correction to facilitate accurate and efficient review. This review does not include Mechanical, Electrical, and Plumbing (MEP). Additional plan check fee will be required after the third review on hourly basis. Obtain approvals from the following agencies, as applicable, prior to permit issuance: Planning Division – Provide Planning approval stamp on the plans. After Building approval, plans will be routed to Planning by Building staff. Police Department (PD) – Provide PD approval stamp on the plans. After Building approval, plans will be routed to PD by Building staff. Public Works Agency (PWA) – Obtain PWA clearance when applicable. After Building approval, obtain Building-approved plans and submit to PWA. Return PWA-approved plans to Building prior to permit issuance. Orange County Fire Authority (OCFA) – Submit plans directly to OCFA when required. Provide OCFA approval prior to permit issuance. County of Orange Health Care Agency (OC Health) – Submit plans directly to OC Health when food service is proposed. Provide OC Health approval prior to permit issuance. School District – Pay applicable school fees after Building approval. Provide the signed Certificate of Compliance prior to permit issuance. Cal/OSHA – Verify whether a Cal/OSHA permit is required and obtain approval when applicable. RESUBMITTAL INSTRUCTIONS Plans Pickup Original plans and calculations are available for pickup at the Building Division counter. Check the Building Division website for counter hours and the closure schedule prior to your visit. Plan Check Corrections Provide a written response addressing all items in this plan check report. Provide a complete response to each comment. Indicate the sheet number, detail number, or note number where each correction is made. If a comment does not apply, provide an explanation. For questions, contact Senior Plan Check Engineer Anson So at aso@santa-ana.org or 714-647-5830. Resubmittal Provide two sets of revised construction documents (drawings, calculations, and supporting documents). For new construction or additions, provide one additional set. Resubmit all construction documents using one of the options below. Option 1: Resubmittal Bin Complete the Plan Check Re-Submittal Form and include it with the resubmittal package. The Resubmittal Bin is located in the City Hall Ross Annex lobby. Option 2: Walk-ins Daily walk-ins are available for resubmittals on a first-come, first-served basis.PLAN REVIEW COMMENTSSheet R-1 Provide a 9" × 9" blank space near the bottom-right corner of the title sheet, outside the title block, for City approval stamps.Only one engineer's stamp shall be provided to identify the official engineer of record. Remove the secondary engineering stamp and revise accordingly. Provide the name and contact information for both the tenant and the landlord.Remove the structural observation program from the plans, as this project is not within OC Public Works jurisdiction and does not involve a residential addition. Provide a note indicating that this project shall comply with the 2025 California Building Code (CBC) and the City of Santa Ana Municipal Code. List all deferred submittals on the plans. If there are none, clearly indicate “No deferred submittals.” Provide the following building data as required by the 2025 California Building Code: occupancy group and type of construction. Provide a detailed Scope of Work on the title sheet describing the proposed construction and the length of retaining wall replacement.Structural CalculationsRefer to item 2 above.Provide vehicular loading as surcharge loads on the retaining wall.End of Comments