Loading...
HomeMy WebLinkAbout340555_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101127150 PROJECT ADDRESS: 1910 E Warner Ave Unit# A PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/9/2026 INITIAL REVIEW 4/27/2026 EXPIRATION 10/6/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nathan Menard 3. TEL: (714)552-2722 FAX: VALUATION: $5,000.00 EMAIL: nathan@menarch.com FLOOD ZONE: X-06059C0279J APPLICABLE CODE: 2025 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☒Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationOCFA checklist item #9 does not look to be completed accurately. “Storage or merchandizing areas in excess of 500 sq ft. where items are located higher than 12 feet” requires OCFA approval. Based on area where storage racks are built, as well as height of racks, OCFA approval exemption is not met. Else it shall be clearly evident how this is met in drawing set.DrawingsSheet CSProvide a complete floor plan showing the entire unit and proposed storage rack locations. Include dimensions for any aisles or clearances required to meet accessibility requirements for the 2025 California Building Code Chapter 11B.Sheet S-01Provide manufacturer spec sheets in drawing set for proposed storage racks to match engineering calculations. Anchorage detail – Post-installed anchor is designed with 3-1/4” effective embedment. Revise drawing to match.Anchorage detail – Specify assumed slab on grade thickness.CalculationsPage 9 of 164 – Provide operating weight iteration or location of where wt is determined.Page 9 of 164 – Seismic Design Force shall be updated to latest ASCE equations for conformity. Typ all rack calculations.Page 157-164 – Identify where uplift demand is referenced from. Verify worst case loading for shared column. Else provide an iteration calculation for demand used. (End of Comment)