Loading...
HomeMy WebLinkAbout340101_1_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101127009 PROJECT ADDRESS: 1035 S Linwood Ave PLAN CHECK ENGINEER: Lee, WayneTEL:714 647-5848 EMAIL: wlee@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/1/2026 INITIAL REVIEW 5/1/2026 EXPIRATION 9/28/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Liza Koutcharyan 3. TEL: (949)664-3194 FAX: VALUATION:$10,000.00 EMAIL: liza@synergyinstallers.com FLOOD ZONE:X-06059C0276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714) 573-6100).Incorporate the hand-written scope of work into the drawing. Revise the scope of work to specify the height, type and length of each storage racks on the cover sheet.Add a note that the applicable Codes are: 2025 CBCand City of Santa Ana Municipal Code.Show on the plans: - OccupancyGroup(s): _____ - Type of Construction:______ - Fire Sprinkler System (State purpose of sprinkler system, for example, area increase under CBC Section 506.3, required by CBC Section 903 for type of occupancy, etc.):_____ - Number of stories/mezzanines and building height in feet:____Show distances between racks and show distance between the racks and the exterior walls.Type C1 is not allowed to be installed over the required exit door. Remove type C1.The structural plans and structural calculations are not consistent with the architectural plans. The architectural drawings designate rack types as A, B, C, and C1, whereas the structural documents identify rack types as 1 through 4. Revise the structural plans and calculations, or the architectural plans, as necessary to provide consistent rack type designations and ensure full coordination across all disciplines. Include a clear correlation between rack types in all documents.END OF COMMENTS